1) seal coat
封底剂
2) cationic prebottom binder
阳离子封底剂
3) back cover
封底
1.
Extra large body of bridge bears the whole main bearing foundation of structure of bridge, service life and security of the whole bridge of back cover quality relation of the foundation pit.
特大型桥梁的锚体或承台都是全桥的主要承重结构的基础 ,基坑的封底质量关系全桥的使用寿命和安全。
2.
That steel hook box cofferdam is that provision design of the hinders water structure for slab foundation construction,whose effect is by the side and the back cover concrete on bottom board or bottom board of the steel hook box cofferdam surrounding water to provide the anhydrous trunk body work environment for slab foundation construction.
钢吊箱围堰是为承台施工而设计的临时阻水结构,其作用是通过钢吊箱围堰的侧板和底板或底板上的封底混凝土围水,为承台施工提供无水的干体作业环境。
4) bottom sealing
封底
1.
With reference to the design and construction of steel boxed cofferdam used at mid-river shoal for the Shengmi Bridge in Nanchang, this paper presents the design process of the single-wall, bottomless huge steel boxed cofferdam, and analyzes in details the construction difficulties of changing of the guiding trusses, internal bracings, sinking and bottom sealing of the cofferdam.
结合南昌生米大桥江心滩套箱的设计与施工,介绍大型单壁无底钢套箱的设计,对其中的导向架、内支撑转换、套箱下沉与封底的施工难点进行了重点分析。
2.
The design and construction technology for rubble grouting concrete of the open caisson wall and of the bottom sealing at the anti impact island of the auxiliary shipping channel of Humen Bridge were introduced,and the economic benefits of adopting the grouting concrete were analyzed in this paper.
主要介绍了虎门大桥辅航道防撞岛沉井井壁片石压浆混凝土和封底片石压浆混凝土施工设计与施工工艺,并分析了压浆混凝土的经济效益。
5) subsealing
封底
1.
Combined with practical engineering of sinking well in underground drainage pumping station in Xinlan road,Taiyuan city,the author introduces its hydro-geological conditions,illustrates structural design elements of sinking well and attentions in the design,and analyzes relevant problems in correcting sinking deviation and subsealing construction,which to offer a reference for similar projects.
结合太原市新兰路地下雨水泵站沉井的工程实例,对其水文地质条件进行了介绍,并对沉井结构设计要点和设计中的注意事项进行了阐述,最后对下沉纠偏及封底施工中的相关问题进行了分析,供类似工程参考借鉴。
6) floor sealing
封底
1.
Construction practice proves that clip insert plate may effectively save the volume of blasting under water, reduce the leakage of floor sealing concrete, and accelerate the construction of foundation in water.
施工实践表明 ,采用扣式插板能有效减少水下爆破工程量 ,降低封底混凝土施工堵漏难度 ,加快水中基础施工进度 ,是一种快速、安全的方法。