1) downhole operation quality
作业施工质量
2) construction operation
施工作业
1.
This paper describes 3 typical accidents of contrac-tors onsite construction operation in petrochemical plants,and points out the existing construction operation problems in petrochemical plant area: the ability of contractors is not good,the owner lacks standardized management for the contractors,and management authority of the owner department in charge of construction operation is weakened.
列举了3起石化装置现场典型承包商施工作业事故,指出了石化装置区施工作业管理中存在的工程承包商作业素质薄弱,工程建设单位对施工管理缺少规范化和标准化措施,工程建设主管部门的管理权威弱化问题。
3) construction
[英][kən'strʌkʃn] [美][kən'strʌkʃən]
施工作业
1.
The construction technologies of single bucket excavator using forth and backhoe digging construction methods are introduced.
针对单斗挖掘机在土石方施工中的特点,介绍了单斗挖掘机中正、反铲挖掘机的基本作业方法,施工作业方法,以及生产率提高的措施等,可供施工中参考。
2.
The key points of the permanent way work in 1998 are to raise train speeds on the existing lines, strengthen the upgrading of the equipment of the tracks and bridges on the Beijing-Guangzhou line, speed up the construction mechanization and quicken the pace of scientific enterprise management.
1998年工务工作仍以既有线提速为重点,强化改造京广线的线桥设备,加快施工作业机械化进程,加快企业管理科学化步伐。
4) job execution
作业施工
5) construction quality
施工质量
1.
The construction quality control of low temperature rapid hardening durable concrete;
低温早强耐久性混凝土施工质量控制
2.
Brief discussion of the construction quality management for decoration engineering and its controlling;
浅谈装饰工程的施工质量管理与控制
3.
The application of fuzzy synthetic evaluation in construction quality assessment;
模糊综合评判在施工质量评定中的应用
6) constructional quality
施工质量
1.
When sprayed on concrete surface,a gel-like silicate was formed to fill in concrete surface for hardening so that surface cracks were prevented or reduced which was effective on improving concrete strength,impermeability and wearability,speeding constructional work and ensuring constructional quality and durability.
在水玻璃中添加几种化工原料进行改性,配制成一种水泥混凝土养护剂,具有与混凝土亲合性较好,喷涂在混凝土表面后,能形成胶状硅酸盐,填充混凝土表层的孔隙,使其硬化,防止和减少表面微裂纹的产生和发展,对提高混凝土的强度、抗渗性和耐磨性及加快施工进度、保证施工质量和耐久性有效。
2.
The older codes for construction and acceptance can not be satisfactory to the necessary of controlling the constructional quality.
在这种背景下,我国相继颁布实施了2001、2002版系列施工质量验收规范。
3.
According to 《Unified standard for constructional quality acceptance of building engineering》 GB 50300 2001concerning provision,some viewpoint is put forward to discussion on the strength interval under given confidence level for 《Technical specification for testing concrete strength with drilled core》 CECS03:2007.
根据《建筑工程施工质量验收统一标准》GB50300-2001的有关规定,对《钻芯法检测混凝土强度技术规程》CECS03:2007修订的主要技术内容之5"在抽样检测结构混凝土强度中引入了一定置信度条件下强度区间的概念"进行了思考,并提出几点见解。
补充资料:施工作业计划
施工企业统一计划体系中的实施性计划。它把施工企业的施工计划任务、工程的施工进度计划和施工现场具体情况结合起来使之彼此协调,以明确的任务直接下达给执行者,因而是基层施工单位进行施工的直接依据。
施工作业计划分月施工作业计划和旬施工作业计划。其内容一般由三部分组成:①本月(旬)应完成的施工任务。一般以施工进度计划形式表示,确定计划期内应完成的工程项目和实物工程量。②完成作业计划任务所需的劳力、材料、半成品、构配件等的需用量。③提高劳动生产率的措施和节约措施。
施工作业计划分月施工作业计划和旬施工作业计划。其内容一般由三部分组成:①本月(旬)应完成的施工任务。一般以施工进度计划形式表示,确定计划期内应完成的工程项目和实物工程量。②完成作业计划任务所需的劳力、材料、半成品、构配件等的需用量。③提高劳动生产率的措施和节约措施。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条