说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> "绿色综合评价"体系
1)  green comprehensive assessment system
"绿色综合评价"体系
2)  green evaluation system
绿色评价体系
3)  comprehensive evaluation system
综合评价体系
1.
Application of comprehensive evaluation system of new wall material;
新型墙体材料综合评价体系的应用
2.
Establishment of comprehensive evaluation system of new wall material;
新型墙体材料综合评价体系的建立
3.
Presented in this paper are a comprehensive evaluation system of die quality,a multiplayer hie~rarchical amendment index system according to the characteristics of cold stamping die production,an evaluation standard referring to the technique and design rules of dies,an scientific evaluation by using the multiplayer hierarchical and the fuzzy comprehensive evaluation method.
针对冷冲压模具生产的特点 ,提出了模具质量综合评价体系和多层次递进修正指标体系 ;参照模具工艺和设计规范确定了评价标准 ,采用层次递进和模糊综合法进行了科学评价 。
4)  FMS comprehensive evaluation
体系综合评价
5)  green evaluation indicator system
绿色评价指标体系
6)  Green construction appraisal system
绿色建筑评价体系
补充资料:“三北”防护林体系工程


“三北”防护林体系工程
"three north protective forest system engineering

  sanbel fanghulln tixi gongeheng“三北”防护林体系工程(“threel幻rOI,,pn〕tective forestsystem engineeri嗯)在中国西北、华北北部、东北西部地区建设的以防护林为主的绿化工程。 该项工程是国家重点建设工程。西起新疆,东至黑龙江,地跨西北、华北、东北共13个省、自治区、直辖市的512个县(旗),总面积4既.9平方千米,占国土总面积的42.4%。按林种规划是:防护林占65.5%,薪炭林占9.7%,用材林占18.6%,经济林占6.0%。耀 西北防护林网之一段(宁南)(《黄土高原》) 据主管部门报道,在第一期(1978~1985年)工程建设中共完成人工造林900多万公顷,保存面积605 .5万公顷,超过计划任务的2%。使1以X〕万公顷的农田得到林网的保护,893万公顷的荒漠与730万公顷的水土流失面积得到初步治理,使输蘸 内蒙古赤峰农田防护林(宝音朝克图摄)人黄河的泥沙量减少10%左右。 “三北”防护林体系建设第二期(1986~1995年)工程要求在保护好现有森林植被和巩固好一期工程成果的基础上,在ro年内完成人工造林、种草面积803 .3万公顷,使“三北”地区的林木覆盖率由5.9%提高到7.7%。 目前,“三北”地区有林地面积已达2330万公顷,林木覆盖率由过去的4%提高到目前的5.9%。建设“三北”防护林体系的目的是在自然条件允许的前提下按照因地制宜、因害设防的原则,最大限度地增加植被覆盖,改善生态环境,并为当地提供一定的经济效益和社会效益。“三北”防护林体系建设工程实施以来,已经对“三北”地区的自然和经济面貌起到了良好的促进作用。有的研究认为,“三北”防护林体系每年可获得总效益25亿元,其中生态效益14亿元,占55.7%;林木生长和副产品产值11亿元,占44.3%。(阎树文)
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条