说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 倒灌保证率
1)  back flowing guarantee ratio
倒灌保证率
1.
In this research,in consideration of probability distribution of flow-through,some new hydrodynamic probability parameters,including retention ratio,sluggish flow ratio and back flowing guarantee ratio,are proposed to represent the hydrodynamic futures of water bodies at monthly scale.
鉴于按多年平均流量估计滞留时间进行富营养化敏感程度分类较为粗糙,在月平均尺度上,考虑径流量的概率分布,提出了滞留率、缓流率、倒灌保证率等新的水动力概率参数反映水体动力特征,使水体富营养化敏感程度的识别及分级建立在考虑年内变化及多年变化的基础之上,使之在敏感分级上有更高的分辨率。
2)  irrigation ensuring rate
灌溉保证率
1.
The design standard of irrigation project is usually represented by irrigation ensuring rate and selected comparatively by the method of economic analysis.
灌溉工程设计标准一般用灌溉保证率表示,常采用经济分析方法进行比较选择,笔者建议采用财务动态分析法,要求灌区内部回收率必须大于12%,净现值必须大于零。
3)  probability of irrigation water requirement
灌溉设计保证率
1.
Rainfall frequency analysis is used commonly to determine probability of irrigation water requirement, and to choose typical years for irrigation project design.
灌区灌溉设计中 ,常用降雨量进行频率分析来选取灌溉设计保证率及其对应典型年。
2.
Now,rainfall frequency analysis is used commonly to determine probability of irrigation water requirement,and to choose typical years for irrigation project design during the plan and design of the land consolidation.
目前土地整理规划设计中常对降雨量进行频率分析来选取灌溉设计保证率及其对应典型年,这种方法没有充分考虑降雨时空分布,而采用对作物净灌溉需水量进行频率分析则可弥补这一缺陷,更具合理性。
4)  power flow backward
功率倒灌
5)  assurance rate
保证率
1.
The influent quality of the two existing wastewater treatment plants in Xi'an was investigated,and the methodology for determination of the influent quality as the basis for design of WWTP according to the frequency of pollutants concentration in wastewater(assurance rate of 85%)was put forward.
对西安市2座城市污水处理厂的进水水质进行了调查和分析,提出按照水质指标浓度出现的频率(85%的保证率)确定污水处理厂设计进水水质的方法。
2.
The article gets an optimization method of linear programming of elasticity constraints by using the content extent function and assurance rate.
本文通过满足程度函数与保证率的引入 ,得到了在弹性约束下的线性规划问题的一种最优化解
3.
The research indicated that,85% of assurance rate could be used to insure the effluent quality meet the standard.
结果表明为保证其出水达标率,可采用85%的保证率。
6)  guarantee rate
保证率
1.
With the calculation of two practical examples,the results show that the guarantee rate of concrete core strength central value from cast-in-situ concrete pile based on Quality Inspection and Evaluation Standards for Highway Engineering(JTJ071-98) i.
2个混凝土强度检测案例的计算结果表明,利用《公路工程质量检验评定标准》(JTJ071-98)进行灌注桩芯样混凝土强度代表值确定,得到的代表值保证率在95%左右波动,具有不确定性;利用《超声回弹综合法检测混凝土强度技术规程》(CECS 02:88)进行单一构件混凝土强度推定,推定值的保证率小于95%,对结构的可靠性鉴定而言是偏于不安全的,应引起试验检测人员的充分重视。
2.
The features of the special vehicle carrier s type are introduced in the paper and the statistics for the main dimensions are made by the method of guarantee rate according to the data of LLOYD S REGISTER OF SHIPPING and the Catalog of Nippon Ships.
介绍专用载车船船型特点,并根据《劳氏船名录》和《日本船舶明细书》等资料,用保证率法统计其主尺度。
补充资料:灌溉保证率
      预期灌溉用水量在多年灌溉中能够得到充分满足的年数的出现机率。又称灌溉设计保证率。它是灌溉工程设计标准的一项重要指标,以百分率表示。
  
  由于各年降雨量、蒸发量、气温、湿度等气象和水文条件的不同,水源供水量和灌溉用水量都有差异。在设计灌溉工程时,如按最干旱年份情况计算供需水量,则可供取用的来水量少,相应确定的设计灌溉面积小,在这种情况下虽然工程运行期间农田受旱缺水的机遇较少,但在不太干旱的年份,可以利用的水源得不到充分利用,这样的设计是不经济的。相反,如按水源较丰富年份进行设计,确定的灌溉面积大;但农田受旱缺水的机遇较多;这样的设计也不尽合理。为了要挑选一个适当年份作为设计灌溉工程供需水量的依据,采用数理统计方法,根据以往若干年份的气象、水文等观测资料,通过统计分析,选出有一定机率的水文年份,作为灌溉设计标准。1984年,中国规定在大、中型灌区设计中,统一采用灌溉设计保证率作为灌溉设计标准,并规定灌溉设计保证率系指设计灌溉用水量的保证程度,用设计灌溉用水量全部获得满足的年数占计算总年数的百分率表示,即:
  
  
  
  式中P为灌溉设计保证率;m为设计灌溉用水量全部获得满足的年数;n为计算总年数(按时历年法,系列一般不少于15年)。
    对于中小型灌区,确定灌溉设计保证率时,可通过现有灌区实际调查,根据经验进行分析,并参考表列数据选定;对于大型灌区,设计时要通过技术经济论证和系统分析予以确定。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条