1) Lingao Nuclear Power Station
岭澳核电站
1.
Start-up Test of Complete Electrical System at Lingao Nuclear Power Station;
岭澳核电站电气整套启动试验
2.
This paper made an introduction to the design of grounding system in Dayawan and LingAo nuclear power stations in Guangdong province It discussed the design philosophy and detailed design method of the grounding system in view of its function and equipmen
介绍广东大亚湾核电站和岭澳核电站接地系统的设计情况 ,从功能、设备等方面论述核电站接地系统的设计原则和具体方
2) Ling Ao Nuclear Power Station
岭澳核电站
1.
Scheme Choice of Circulating Water Pumps for Ling ao Nuclear Power Station Phase Ⅱ;
岭澳核电站二期工程循环水泵选型分析
2.
With morphology observation and chemical composition analyses by SEM and EDS as well as immersion test and corrosion potential measurement,the corrosion of debris filters in the CRF system of Ling Ao Nuclear Power Station was studied.
通过形貌观察、化学成分分析、扫描电镜及能谱分析、浸泡试验、自腐蚀电位测定,研究了岭澳核电站CRF系统碎石过滤器的腐蚀现象,其主要原因被归结为微生物腐蚀的作用。
3) Ling ao nuclear power plant
岭澳核电站
1.
Holing techniques for constructing impervious wall in the quarrying rock layer of the wave breaker of Ling ao nuclear power plant;
岭澳核电站防波堤块石层防渗墙造孔技术
4) Lingao Nuclear Power Station(Phase II)
岭澳二期核电站
1.
Lingao Nuclear Power Station(Phase II),as the third one after Shenzhen Daya Bay and Lingao Phase I Nuclear Power Station,will be installed 2×1,000MW PWR and be put into commercial operation in 2010 and 2011 respectively.
岭澳二期核电站是中国广东核电集团继大亚湾核电站、岭澳一期核电站之后,在广东深圳地区建设的第三座百万千瓦级大型商用核电站。
6) LingAo Nuclear Power
岭澳核电
1.
Project Management Mode Selection & Actualizing Strategy Analysis of LingAo Nuclear Power Project Phase II;
岭澳核电站二期工程项目管理模式选择及实施策略分析
补充资料:833兆瓦的缅因扬基核电站(美国)
833兆瓦的缅因扬基核电站(美国)
… … (中上左) 833兆瓦的缅因扬基 核电站(美国)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条