说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 岭澳核电
1.
Discussing of Project Management Model in Lingao Nuclear Power Station;
岭澳核电站工程项目管理模式的探讨
2.
Construction Technology of Safety Shell Prestress in Ling'ao Nuclear Power Station Phase Ⅱ
岭澳核电站二期核岛安全壳预应力施工技术
3.
Analysis of Turbine Fire Protection System of Ling’ao Nuclear Power Plant Phase II
岭澳核电站二期汽轮发电机轴承消防系统分析
4.
Vibration Optimization of Emergency Diesel Engines in Daya Bay and Ling AO Nuclear Power Stations
大亚湾、岭澳核电站应急柴油机振动问题治理
5.
Technical Improvement of ATE System of Ling’ao Nuclear Power Plant PhaseⅡ
岭澳核电站二期凝结水处理系统重大技术改进
6.
Application of Digital Borehole Optical Technique at Lingao Nuclear Power Plant
数字光学成像技术在岭澳核电厂的应用
7.
Application of Forced Air Cooling Isolated-phase Bus to Ling'ao Nuclear Power Station
风冷式封闭母线在岭澳核电工程中的实践
8.
STUDY ON LOCALIZATION OF MANUFACTURE OF UNDERRELAXATION PRESTRESSED STEEL SHANDS FOR CONTAINMENT OF Ling'ao NUCLEAR POWER PLANT (PHASE-Ⅱ) AND ITS USE
岭澳核电二期核岛安全壳低松弛预应力钢绞线国产化研究及应用
9.
Project Management Mode Selection & Actualizing Strategy Analysis of LingAo Nuclear Power Project Phase II;
岭澳核电站二期工程项目管理模式选择及实施策略分析
10.
Recalculation of RPS Probabilistic Safety Assessment Results of Ling’Ao Nuclear Power Plant Units 3&4
岭澳核电站3、4号机组反应堆保护系统概率安全评价结果校算
11.
Field shearing test for heavily weathered hornstone of Three Phase Project of Ling'ao Nuclear Power Station
岭澳核电三期强风化角岩边坡岩体直剪试验研究
12.
The Control and Improvement of FAC in LingAo II Feedwater Pipe Work
岭澳核电站二期给水管道流动加速腐蚀的控制与改进
13.
Design Optimizations for Conventional Island for Ling'Ao Phase II Nuclear Power Plant
岭澳核电站二期工程常规岛主厂房布置设计优化
14.
Organization and Efficiency in Takeover Management of Large--scale Project --case study of Daya Bay nuclear power plant and Ling Ao nuclear power plant;
大型工程移交管理中的组织与效率——对大亚湾核电工程和岭澳核电工程的案例研究
15.
Welding technology conclusion of 3R55 dome pipes in Ling'ao 2 period nuclear power plant
岭澳二期核电站3R55穹顶管道焊接技术
16.
Discussion on Quality Assurance Classification Management in Guangdong Ling ao Phase II Nuclear Power Project;
广东岭澳二期核电工程质保分级管理的探讨
17.
Research on Modeling Conventional Island of Lingao Phase Ⅱ Nuclear Power Plant Thermal-Hydraulic System
岭澳二期核电站常规岛热力系统建模分析与研究
18.
The Quality Management of Nationlized Manufacturing of Ling ao MSR Project;
岭澳MSR国产化制造中的质量管理