说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 煤芯
1)  Coal Core
煤芯
1.
The Influence of Drilling Coal Core Sample ′s Collection and Coal Quality Determination on Rational Use of Coal Resources;
正确采取煤芯煤样 合理利用煤炭资源
2.
We can determine coal-bed gas synthetically through the three methods including lithologic characteristics、gas logging abnormity and engineering parameters to accurately judge the position of coal core during mud-logging,together with some new methods of calculating the quantity of coal-bed gas on the spot,such as gas reference method and thermovacuum distillation of drilling fluid,etc.
 煤层气勘探岩芯录井至关重要,可通过利用泥浆录井过程中岩性特征、气测异常和工程参数卡准煤芯位置的3种技术方法以及利用气体参照法、钻井液热真空蒸馏法等现场计算煤层气量的新方法来综合判定煤层气。
3.
Based on an auto-simulating experiment of the CBM desorption during pick-up of coal core under drilling fluid medium,we discussed systemically the effects of CBM pressure,core-hoisting velocity,coal granularity and drilling fluid density on desorption-diffusion behavior.
准确求取钻井液条件下煤芯煤层气逸散量,是确定煤层含气量的关键。
2)  coal core sampling
煤芯煤样
3)  coal core assay
煤芯样化验
4)  clastic coal core
碎屑状煤芯
1.
Gas desorption lsaw of clastic coal core study;
碎屑状煤芯瓦斯解吸规律研究
5)  percentage recovery of coal core
煤芯采取率
6)  Steel cord conveyor belts of ST flame-retardant
煤矿用钢丝绳芯阻燃输送带
补充资料:Z8612热芯盒射芯机操作规程
1、遵守铸造设备通用操作规程。
2、工作前还必须遵守:
a、
检查设备上行程开关和碰块的位置是否正确,如不正确,必须调整。
b、
接通电源,打开压缩空气伐门,先用手动方法,对各机构逐进行点动试车,然后用自动方法,进行一个循环试车,确认一切正常后,方可进行生产。
3、工作中还必须遵守:
a、
在设备开动后,一个循环未完成时,不许中途调整电器,以免发生误动作,造成设备人身事故;
b、
设备的每一个循环后,必须用喷咀清除芯盒上残存的砂子,并喷涂分型剂;
c、
在未切断电源和所气源前,不准将手伸入芯盒和夹紧器之间的空隙处,或把手放在导轨上,以免发生人身事故。
d、 一般不准空射,如必须空射,一定要把压缩空气伐门关小;
e、 如果用手操作,不准同时操作两个电器开关。
4、工作后还必须遵守:
a、
操纵各个电器开关,使设备各机构恢复到原始位置,然后切断电源和气源;
b、 折下射砂头,清理积砂和粘砂;
c、 清除排气塞内的粘砂;
d、
取下射砂筒,清除缝隙中的粘砂,最后用石蜡涂擦内壁,但不要将缝隙堵塞;
e、 清除闸板上的积砂,并在闸板上涂石墨粉,以减少磨擦;
f、 清除导轨和导杆上的积灰和积砂,并涂上一层润滑油。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条