1)  change of design
变更设计
1.
Issues related to change of design are discussed in terms of procedure and principle of design change.
通过对变更设计的程序和原则进行的分析,阐述了变更设计涉及的几个主要问题。
2)  changing design
变更设计
1.
Combined with the practical project of S113 route 13 m common blank board from pre-equipment to current-pouring,it introduces the changing design course of common blank board from pre-equipment to current-pouring,points out that current-pouring blank board construction is convenient,good in general features and worth spreading.
结合S113线跨径13 m普通空心板由原设计的预制安装施工改为现浇施工的设计实践,介绍了普通空心板由预制安装改为现浇施工的变更设计过程,指出现浇空心板施工方便、整体性好,值得推广应用。
3)  changed design
变更设计
1.
On the design problem of the joining point of QiTai Road stereo-bridge s assistant road and the river-beach road,the best technological methods of changed design in constructional practise and the effective measures of handling the frost heave problem of assistant road s bottom base are given in the paper.
对于乌市奇台路立交桥辅道与河滩公路路面衔接的设计问题,本文给出了在施工实践中变更设计的最佳技术方法以及处理辅道底基槽出现翻浆问题,而采取的质量保证措施。
4)  design change
设计变更
1.
To solve the problem of design change of auto panel dies,the integrated information in different developing stages of auto panel dies is firstly analyzed.
为了解决覆盖件模具企业的设计变更问题,首先分析了覆盖件模具产品开发不同阶段的BOM信息。
2.
Their are effective measures of costs control for mountainous expressway construction,such as aborative design,enhancement of follow-up service of design,strengthening of management for design change,positive cooperation among all the participants of the construction,strictly controlling of design change.
精心设计、加强设计后续服务、强化变更设计管理、各方密切配合、严格控制设计变更,是控制山区高速公路工程造价的有效途径,可供同类工程参考。
3.
Due to the start of construction in a hurry,some design changes and optimization have been made after the start of project construction,such as increasing the rated head of unit,adoption of gravity dam connecting with two banks,using GIS for switchyard equipment,river closure ahead o.
工程开工后进行了一些设计变更和设计优化工作,如提高机组额定水头,两岸采用重力坝接头,开关站设备采用GIS,提前截流、提前发电,研究采用300 t级水力式升船机,采用铁矿渣与石灰岩粉混凝土双掺料等。
5)  design alteration
设计变更
1.
Strength site attestation and design alteration management and improve engineering benefit;
加强现场签证及设计变更管理 提高工程效益
2.
Discussion of HVAC design alteration and management of project licenses;
浅析某暖通空调工程设计变更与工程签证管理
3.
Aim at the distinctness of design alteration procedure in current code and standard, put forward some opinion.
针对当前的法规、规章和规范中关于设计变更程序的不同之处提出一些看法。
6)  design alternation
设计变更
1.
On the management of the project visa and design alternation;
论工程签证和设计变更的管理
2.
Measures to strengthen the management of design alternation and project license;
如何加强设计变更和工程签证的管理工作
3.
The measure on improving the economic benefit of an enterprise through strengthening management of design alternation and on-site certificate;
谈加强设计变更和现场签证的管理提高企业经济效益的措施