说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 施工设计变更
1)  construction design alteration
施工设计变更
2)  change of construction project
施工变更
3)  design change
设计变更
1.
To solve the problem of design change of auto panel dies,the integrated information in different developing stages of auto panel dies is firstly analyzed.
为了解决覆盖件模具企业的设计变更问题,首先分析了覆盖件模具产品开发不同阶段的BOM信息。
2.
Their are effective measures of costs control for mountainous expressway construction,such as aborative design,enhancement of follow-up service of design,strengthening of management for design change,positive cooperation among all the participants of the construction,strictly controlling of design change.
精心设计、加强设计后续服务、强化变更设计管理、各方密切配合、严格控制设计变更,是控制山区高速公路工程造价的有效途径,可供同类工程参考。
3.
Due to the start of construction in a hurry,some design changes and optimization have been made after the start of project construction,such as increasing the rated head of unit,adoption of gravity dam connecting with two banks,using GIS for switchyard equipment,river closure ahead o.
工程开工后进行了一些设计变更和设计优化工作,如提高机组额定水头,两岸采用重力坝接头,开关站设备采用GIS,提前截流、提前发电,研究采用300 t级水力式升船机,采用铁矿渣与石灰岩粉混凝土双掺料等。
4)  change of design
变更设计
1.
Issues related to change of design are discussed in terms of procedure and principle of design change.
通过对变更设计的程序和原则进行的分析,阐述了变更设计涉及的几个主要问题。
5)  design alteration
设计变更
1.
Strength site attestation and design alteration management and improve engineering benefit;
加强现场签证及设计变更管理 提高工程效益
2.
Discussion of HVAC design alteration and management of project licenses;
浅析某暖通空调工程设计变更与工程签证管理
3.
Aim at the distinctness of design alteration procedure in current code and standard, put forward some opinion.
针对当前的法规、规章和规范中关于设计变更程序的不同之处提出一些看法。
6)  design alternation
设计变更
1.
On the management of the project visa and design alternation;
论工程签证和设计变更的管理
2.
Measures to strengthen the management of design alternation and project license;
如何加强设计变更和工程签证的管理工作
3.
The measure on improving the economic benefit of an enterprise through strengthening management of design alternation and on-site certificate;
谈加强设计变更和现场签证的管理提高企业经济效益的措施
补充资料:施工设计洪水


施工设计洪水
design flood during construction period

衰1临时性水工建筑物洪水标准┌─────────┬──────────────┐│建筑物类型 │建筑物级别 ││ ├──┬───┬───┬───┤│ │2 │3 │4 │5 ││ ├──┴───┴───┴───┤│ │洪水重现期(a) │├─────────┼──┬───┬───┬───┤│土石建筑物 │)50 │50~30 │30~20 │20~10 │├─────────┼──┼───┼───┼───┤│混凝土浆砌石建筑物│)20 │20~10 │10~5 │5~3 │└─────────┴──┴───┴───┴───┘裹2坝体施工期临时渡汛的洪水标准┌───────────┬────────────┐│坝型 │拦洪库容(亿m“) ││ ├───┬────┬───┤│ │>1 .0 │1 .0~0.1│<0 .1 ││ ├───┴────┴───┤│ │洪水重现期(a) │├───────────┼───┬────┬───┤│土坝、堆石坝、干砌石坝│)100 │100~50 │50~20 │├───────────┼───┼────┼───┤│混凝土坝、浆砌石坝 │)50 │50~20 │20~10 │└───────────┴───┴────┴───┘ 施工设计洪水的计算内容包括设计洪峰流量、洪量及设计洪水过程线。当施工设计洪水采用年最大设计洪水时,其计算方法同设计洪水。分期设计洪水的计算方法,一般也是采用频率计算法,从各年资料中选取施工时段中的最大洪峰、洪量进行频率计算。分期的划分,除根据施工设计的要求外,还要考虑洪水的不同天气成因及洪水季节变化的规律。分期时段不宜过短,一般不短于一个月,分期洪水的选择方法有不跨期和跨期两种。不跨期选样时,若一次洪水过程位于两个分期,则视其洪峰或时段洪量主要位于何期,即作为该期的样本而不作重复选样。跨期选样时,跨期的幅度一般不超过5~10天。有历史洪水时,按其发生的日期,加人在该分期洪水的系列中进行频率计算。施工洪水的洪水标准较低,当具有较长资料系列时也有直接采用经验频率值的。 由于分期洪水的年际变化较大,分期历史洪水又难以调查考证,因此其计算成果误差较大。对分期设计洪水成果,一般都要作合理性检查,分析各分期洪水的统计参数和同频率设计值的年内变化规律,并与年最大洪水的统计参数和同频率设计值进行比较。使用分期洪水成果,由于样本选择方法的不同,成果使用也不同。使用不跨期选样的成果,当邻期的设计值大于本期的设计值时,可将邻期成果移用于本期的一定时间范围内,其移用范围一般不超过5一10天。shlgong she]1 hongshu-施工设计洪水(design fl以xlduring。onstrue-tion period)符合水电站施工设计标准的洪水。为水利水电工程施工导流、施工进度安排或其他施工期防洪要求的设计依据.施工设计洪水包括年最大设计洪水及年内各分期的设计洪水。年最大设计洪水用于围堪、导流洞或坝体挡水的防洪设计;分期设计洪水用于考虑施工进度安排、施工截流期等的选择。中国1978年颁发《水利水电枢纽工程等级划分及设计标准》(SDJ 12一78)对临时性水工建筑物及坝体施工期临时渡汛的洪水标准做出了规定,见表1及表2。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条