说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 钢管混凝土
1)  concrete filled steel tube
钢管混凝土
1.
Test analysis of the suspender force of the large span concrete filled steel tube arch bridge;
大跨度钢管混凝土拱桥吊杆索力测试分析
2.
Seismic behavior research of composite shear wall with concrete filled steel tube columns for different axial-load ratios;
不同轴压比下钢管混凝土边框组合剪力墙抗震性能研究
3.
Seismic experimental research on high strength concrete composite shear wall with concrete filled steel tube columns;
钢管混凝土边框高强混凝土组合剪力墙抗震性能试验研究
2)  concrete-filled steel tube
钢管混凝土
1.
Research and engineering application about defects detection of concrete-filled steel tube by ultrasonic method;
超声法检测钢管混凝土缺陷的研究及工程应用
2.
Ultrasonic testing for rectangle section of concrete-filled steel tube;
方形截面的钢管混凝土超声法检测探讨
3.
Finite element simulation on seismic behavior of Concrete-filled steel tube-reinforced concrete ring beam joint;
钢管混凝土柱-钢筋混凝土环梁节点抗震性能的有限元模拟
3)  CFST
钢管混凝土
1.
To Summarize The Study Situation Of Strengthening The Ring Node OF CFST Structure;
钢管混凝土结构加强环节点研究现状综述
2.
To Discuss The Feasibility Of Applying CFST In Transmission Line;
钢管混凝土应用于输电线路的可行性探讨
3.
The Influence of Long Span CFST Arch Bridge Deck Under Seismic Load;
桥道系对中承式钢管混凝土拱桥地震响应的影响
4)  concrete filled steel tubes
钢管混凝土
1.
Test and research on axial pressure behavior of concrete filled steel tubes after constant temperature;
恒高温作用后钢管混凝土短柱轴压试验
2.
Shear strength of connections between concrete filled steel tubes and beams;
钢管混凝土柱与梁节点抗剪承载力
3.
The application comparison of concrete filled steel tubes pole and formed steel pole in factory building
钢管混凝土柱和型钢柱在厂房中的应用比较
5)  concrete filled steel tubular
钢管混凝土
1.
Experimental study for destroyed form and energy dissipation capacity of concrete filled steel tubular column-reinforced concrete ring flat beam interior joints;
钢管混凝土柱-环扁梁中节点破坏形态和耗能能力研究
2.
Comprehensive construction technology of concrete filled steel tubular arch bridge;
钢管混凝土拱桥综合施工技术
3.
On punching shear resistant performance of concrete filled steel tubular slab column joint;
浅析钢管混凝土板柱节点抗冲切性能
6)  concrete filled tube
钢管混凝土
1.
Scheme selection and design main points of concrete filled tube columns for super high-rise buildings
超高层框架柱方案选型及钢管混凝土柱设计要点
2.
The Beijing Fortune Plaza 2 office tower is 265m tall and will become the second tallest building after the CWTC 3A mega tower in Beijing at intensity 8 seismic zone and the tallest building adopting composite structural system composed by concrete filled tube frame and concrete core.
北京财富中心二期办公楼结构总高度265m,将成为继国贸三期A座之后,8度抗震区北京的第二高楼和采用钢管混凝土框架+钢筋混凝土核心筒结构体系最高的建筑。
补充资料:钢管混凝土结构施工


钢管混凝土结构施工
construction of concrete depositing steel pipe structure

gangguan hunn旧gtuJ一egou shjgong钢管混凝土结构施工(eonstruetion of con-erete depositing steel pipe strueture)钢管混凝土结构是利用钢管与灌入管中的混凝土共同作用的原理设计的一种复合结构。它兼有钢管结构和钢筋混凝土结构的优点,承载力较高,塑性和韧性较好,可节省材料,缩短工期,目前已在工业和民用建筑工程柱系统中应用。钢管混凝土结构柱施工程序如图。六饰(定施讨月管柱八开设扫卜心月管柱八卜部结矛匆尧灌僧汾、处理陇乃 回流装里 钢管混凝土柱施工程序网络图 钢梵段节的制作管材优先采用螺旋焊接钢管,也可用滚床自行卷管,卷管方向应与金属压延方向一致。根据板厚开始板端坡口,坡口端应与管轴垂直,尽可能采用自动焊接。管肢和各种腹杆焊成后都需进行构件调直。过长的管肢无法进行运输时,应在制作厂进行预组装,经检查合格后再拆开分段运输。 部件组合拼装制成的钢管段节,经检验合格后严格按照规定的工艺要求程序在专用胎具上进行拼装组合,并注意下列事项:(1)管肢对接宜采用分段反向焊接工艺.严格保持焊后管肢的平直。焊接前对小口径钢管应采用点焊定位;对大口径钢管可用附加筋在管外作对口联焊。(2)重要受力管肢,应在管内接缝处加设附加垫圈,并与管内壁保持0.smm的膨胀间隙,以确保焊缝根部质量。(3)主肢钢管与附属焊件的间隙应按饭金展开图进行放样和切割。当节点处的焊接道数较多时,应选择合理的焊接顺序,以减少焊接内应力与变形。(4)钢管构件经检查合格后,应按设计要求进行防腐处理。 结构件安装为了加快安装进度和减轻吊装重量,宜先将空管构件按承重骨架方式进行安装,然后再向管内填灌混凝土。事先应对钢管结构进行强度和稳定性验算。对于多层框架结构可采取分层施工、构件分层安装和分层灌筑混凝土的方法。为了减少柱肢的安装接头,尽可能采用长柱吊装法,即一次吊装的柱高范围可以有2~5层梁板,这样可构成空间框架,为各层主次梁安装及楼板施工提供工作面,以便于进行主体交叉作业。长柱擂入杯口后应立即校正、加固,填筑混凝土固定柱脚,并用缆绳加以固定,然后吊装机械方可脱钩,在杯口二次灌浆后拆除缆绳。第一层钢管柱和主、次梁内混凝土填筑完毕后,结构已有稳固的基层。第二节柱肢的安装。可依靠塔吊式起重机对中校直,完成第一道焊缝后脱钩,然后进行补焊。 管内混凝土填筑空钢管安装成竖向构件后,混凝土采用竖向灌筑补充,由于抛落高度大,混凝土凭其自重无需振捣即能冲压密实。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条