1) stope slope
采场边坡
1.
Two empirical forecasting models of shear strength,such as probability model and deterministic model are established respectively,providing reliable strength parameters for design and evaluation of stope slope engineering of Taihe iron mine and other correlative geotechnical engineering about .
采用耦合元胞自动机(CA)与FLAC3D的三轴数值模拟试验方法,对太和铁矿冰碛土体的抗剪强度参数模拟样本进行了统计分析和非线性拟合,分别建立了抗剪强度的2个经验预测模型,即概率模型和确定性模型,为太和铁矿采场边坡工程及冰碛土相关岩土工程的设计与评价提供了可靠的强度参数。
2) Mine rockmass slope
采场岩体边坡
3) high-steep slope of open pit
露天采场高陡边坡
4) opencut mining sideslope
露采边坡
1.
The remaking underground mining with opencut mining was broken that when the FuJiawu Mine should be mining,A large breaddown was occured at some opencut mining sideslope in november of 1997 years,it is building six years since.
江西富家坞“坑改露”技改工程 ,前后经过 6年的基建施工 ,在即将竣工投产的 1 997年 1 1月发生露采边坡大垮塌。
5) Mining slope
采矿边坡
6) final excavation side-slope
终采边坡
补充资料:采场测量
采场测量
surveying in stope
ea一ehang eellang采场测且(surveying in stope)采场回采矿石阶段的测量工作。采场测量的目的是绘制采场的平面图、纵投影图和断面图,以统计矿石产量和计算矿石损失率和矿石贫化率。采场测量包括:(l)根据采准巷道和采场内的控制点标定采场位置、炮孔位置、验收和填图。(2)测量采场的轮廓并填图。 随着.矿体赋存条件和采矿方法的不同,采场测绘方法也异,分为人员能进人的采场测量、深孔刚量和采场空周测量。人员能进人的采场测量分为两种情况:(l)矿床较窄,用浅孔留矿法开采时,形成狭长采空区,在两天井间敷设经纬仪或罗盘仪导线,用支距法测量采场轮廓。并绘制采场平面图、断面图和纵投影图等(图1)。(2)采场较宽大时,采用极坐标法,用经纬仪、平板仪或罗盘仪进行测绘,通过天井把导线点引入采场,建立控制点I、I、兀、份(图2)。在l点安置经纬 纵投影图A一A断面图经 图1留矿法采场图姐分 图2宽大采场测t仪,后视l点,依次测量采场各轮廓或顶底板各特征点的坐标和高程,最后绘制采场图。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条