说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 投资回收期
1)  Investment recovery period
投资回收期
1.
56%, investment recovery period was 3.
56%,投资回收期3。
2.
The understanding of FIRR, FNPV and investment recovery period is also given a popular explanation in this paper.
根据实际筹资情况对全部投资现金流量表计算指标进行思考和修正,并对FIRR、FNPV和投资回收期等指标的理解给予通俗的解释。
3.
In order to provide reference for efficient management and scientific and rational investment,investment and output of Ganwu series demonstration forest in Camellia oleifera clone in Baitu Town of Fengcheng City were analyzed,and cash flow and investment recovery period were predicted by technical economy analysis method.
为给油茶的高效经营提供经济效益参考和科学合理投资的依据,调查分析了丰城白土镇赣无系列油茶示范林的投入产出情况,并采用技术经济分析方法预测其现金流量和投资回收期
2)  payback period
投资回收期
1.
Compares the annual operation cost and payback period of the ice-storage system under different electricity prices.
从初投资和运行费用角度,对深圳某厂房冰蓄冷空调系统与常规空调系统进行经济比较;对不同电价政策下的冰蓄冷空调系统的年运行费用和投资回收期进行比较;提出对于三段分时电价,采用平峰电价的加权平均值代替峰时电价来计算峰谷电价比更为合理。
2.
It is concluded that the model of appraisal is generally subject to the way of operation and management thereof, and that an internal earning rate of 4% before the income tax, and a payback period of 18 years, including the time for construction, are appropriate.
财务评价是项目可行性研究的重要内容, 本文对污水处理项目财务评价的几个具体问题作了较为系统的探讨, 结果表明: 评价模型主要取决于污水厂投产后的运营管理模式; 财务内部收益率( 所得税前) 取4% 、投资回收期( 含建设期)为18 年左右是较为合适的。
3.
Aiming at improving the indexes on payback period, Dr.
D·H·艾伦博士提出等效最大投资周期指标用以评价项目投资的效果,以期对投资回收期指标予以改进。
3)  investment payback period
投资回收期
1.
For example,this article presented the static investment payback period was 2.
以福州市洋里污水厂出水回用为例,运用费用效益分析方法计算得出静态投资回收期为2。
4)  Payback period of investment
投资回收期
5)  investment payoff period
投资回收期
1.
This article analyses the relationship between investment payoff period and discount rate, and studies the methods to determine investment payoff period and discount rate when we assess the economic value of a project.
动、静态投资回收期及财务净现值(FNPV)和经济净现值(ENPV)是确定工程项目是否能接受的重要参数,而基准折现率和社会折现率又是项目价值判断的标准。
2.
Based on the main influencing factors for investment payoff period and analysis of their probability distribution model,a simulation model for payoff period of construction investment was established using the random number generator to simulate the variation of the influencing factors.
在提出投资回收期的主要影响因素并分析其概率分布模型基础上,利用随机数发生器模拟影响因素的变化,建立了项目投资回收期的仿真模型;最后举实例分析了当净现金流量满足β分布时建设项目投资回收期的仿真模型,模拟结果表明该方法可以为项目投资决策提供依据。
6)  capital pay-off time
投资回收期
1.
Finally, the capital pay-off time is determined as 14 years and the profits rate is 12% per year.
详细分析了土地征用、建筑工程和设备投资、办学收入和运营费,最终确定投资回收期为14a,内部收益率约12%。
补充资料:欧洲式期权、美国式期权与亚洲式期权


欧洲式期权、美国式期权与亚洲式期权


  【欧洲式期权、美国式期权与亚洲式期权】期权合约所规定的权利有一定的时效期,过了失效日后,权利即行作废。一些期权规定权利仅能在有效期的最后一天执行,这种期权被称为欧洲式期权(ell功pean叩tions);另一些期权则容许在有效期内任何一天执行,这种期权被称为美国式期权(一~oPtions)。值得指出的是,虽名为欧洲式或美国式期权,但已无任何地理上的意义。由于欧洲式期权的规定过于严格,又出现了一种“改变的欧洲式期权”,它允许期权在一定的时间范围内进行交易。可见,美国式期权为期权购买者提供了更多的选择机会,因此,它的购买者也往往需支付更高的保险费。近年来无论在欧洲或美国,所交易的期权均以美国式为主,欧洲式期权虽仍存在,但其交易量已比不上美国式期权。 在so年代末期,市场上又出现了一种所谓亚洲式期权(asian ontions),但也无地理上的意义,其差别主要在于履约价值(exe而sev公此)的计算。以买权为例,无论是美国式期权或是欧洲式期权,执行权利所能得到的履约价值均为当时标的物的市价减去履约价格,再乘以合约所定的数量,但亚洲式期权的履约价值则为权利期间内标的物市价的平均(计算至履约日为止),减去履约价格,再乘以合约所定的数量。
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条