1) concrete backfill
混凝土充填体
2) concrete filled
填充混凝土
1.
Experimental comparison on static behavior of a tubular N-joint(JD-A) and a concrete filled tubular N-joint(JD-B) under the axial compression of brace and chord is carried out.
对承受支管轴力和主管轴力的N型圆钢管相贯节点(JD-A)、主管填充混凝土节点(JD-B)试件进行了极限承载力对比试验。
2.
Static tests on a tubular N-joint (JD-A), a plate reinforced tubular N-joint(JD-B), a tubular N-joint with concrete filled in chord (JD-C) and a tubular N-joint reinforced by both concrete and plate(JD-D) under the axial compression of brace and chord were carried out.
对承受支管轴力和主管轴力的N型圆钢管相贯节点(JD-A)、垫板加强节点(JD-B)、主管填充混凝土节点(JD-C)、主管填充混凝土和垫板加强节点(JD-D)试件进行了静力试验。
3.
An experimental study was carried out on a tubular N-joint,a plate reinforced tubular N-joint,a concrete filled tubular N-joint,and a N-joint reinforced by concrete and plate under the axial compression of brace and chord.
对承受支管轴力和主管轴力的N型圆钢管相贯节点、垫板加强节点、主管填充混凝土节点、主管填充混凝土和垫板加强节点试件进行了试验研究。
5) cementation filling with cement
混凝土胶结充填
6) Concrete-filled steel tube
混凝土填充钢管
补充资料:充填体作用
充填体作用
function of fill mass
ehongtlontl Zuoyong充填体作用(funet:on of fill nlass)用充填体支撑采场周围岩体,以减轻采场围岩的变形和片落充填体是充填材料充填到采空区后形成的整体。在上向回采的充填采矿法采场中,充填休还充当L作台;在下向回采的充填采矿法采场中,充填体可充当人工顶板充填体的支撑仁要有二个作用 (1)改变围岩中的次生应力场(见图) (2)提高采场围岩和矿柱的强度采场的上下盘岩石和矿柱表面,在充填前处于二维应力状态,而且表层的低应力破裂区的强度很低。充填后,这些表面受到侧压力作用,破裂区受到约束,从而进人三维应力状态充填体提供的横向约束力氏可按下式计算: (l一几)(1平几) 伪、一氏一厄石不歹厂一式中。、为作用于围岩上的垂直应力;几为侧压力系数, 少二声、,、,一*,,*二一、二、,,~山,「,~几一tan止(于一音),笋为充填体的内摩擦角。围岩强度 、一‘”、42”‘zJ/‘一万「丁曰子「J~J,,、少’J“~‘曰J山~/气、 /、了,,J 、‘升狂笋神一 1 23 充填体对次生应力场的影响 1石r体;z回采工侄空司3充填体; 1、5分别为松散充填和胶结充填时的顶板压应力曲线 汀了原岩压立力增大值么5。可按下式计算: 1一、In笋 △5,、一民、一 一p一1一Sln笋式中(l+S,n沪)/(1一sln妇为围岩的塑性系数。 (3)降低岩体应力能量释放速度,防止应力集中,减少岩爆危害。因为充填体弹性模量小,能产生大的塑性变形,从而让压性能好。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条