说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 填芯混凝土
1)  core concrete
填芯混凝土
1.
Axial pull-out test of core concrete of prestressed concrete pipe piles and analysis of stress at the pile end;
填芯混凝土轴拔试验及桩端应力分析
2.
It can embed reinforced bar and pour concrete in pile s upper portion to make it combined with the platform,so the core concrete can improve shear performance of the pile.
在试验的基础上对预应力管桩的抗剪承载力进行了研究,并对填芯混凝土在抗剪承载力中的作用进行了探讨。
3.
The end of prestressed concrete pipe pile is joined with base slab through the core concrete.
预应力管桩桩顶通过填芯混凝土与基础平台相连,对于地下水丰富地区桩箱、桩筏基础以及对于受倾覆力矩作用的高层建筑或高耸结构,基础有可能全部或者一侧受拉,使得桩顶填芯混凝土受到拉拔力作用。
2)  prestressed concrete pipe pile with the concrete core
填芯预应力混凝土管桩
3)  concrete core
混凝土芯;土芯
4)  concrete filled
内填混凝土
1.
Twelve concentrically compressed concrete filled circular CFRP-steel tubular members are experimentally investigated and the test results are analyzed as well in order to understand their static performances and the influences of slenderness ratio and bending strengthening factor on the ultimate load bearing capacity and the load bearing capacity enhancement ratio.
试件的载荷-柱中挠度曲线可以分为弹性阶段、弹塑性阶段、塑性阶段和下降段;笔者研究对象的延性优于FRP筒内填混凝土轴压构件。
2.
Twelve eccentrically compressed concrete filled circular CFRP-steel tubular columns are experimentally investigated and the test results are theoretically analyzed in order to understand their static performances and the influences of slenderness ratio and eccentricity ratio on the ultimate load bearing capacity.
结论CFRP-钢管混凝土偏压柱的延性性能要好于FRP筒内填混凝土偏压柱。
5)  concrete filled
填充混凝土
1.
Experimental comparison on static behavior of a tubular N-joint(JD-A) and a concrete filled tubular N-joint(JD-B) under the axial compression of brace and chord is carried out.
对承受支管轴力和主管轴力的N型圆钢管相贯节点(JD-A)、主管填充混凝土节点(JD-B)试件进行了极限承载力对比试验。
2.
Static tests on a tubular N-joint (JD-A), a plate reinforced tubular N-joint(JD-B), a tubular N-joint with concrete filled in chord (JD-C) and a tubular N-joint reinforced by both concrete and plate(JD-D) under the axial compression of brace and chord were carried out.
对承受支管轴力和主管轴力的N型圆钢管相贯节点(JD-A)、垫板加强节点(JD-B)、主管填充混凝土节点(JD-C)、主管填充混凝土和垫板加强节点(JD-D)试件进行了静力试验。
3.
An experimental study was carried out on a tubular N-joint,a plate reinforced tubular N-joint,a concrete filled tubular N-joint,and a N-joint reinforced by concrete and plate under the axial compression of brace and chord.
对承受支管轴力和主管轴力的N型圆钢管相贯节点、垫板加强节点、主管填充混凝土节点、主管填充混凝土和垫板加强节点试件进行了试验研究。
6)  concrete-filled
填充混凝土
补充资料:Z8612热芯盒射芯机操作规程
1、遵守铸造设备通用操作规程。
2、工作前还必须遵守:
a、
检查设备上行程开关和碰块的位置是否正确,如不正确,必须调整。
b、
接通电源,打开压缩空气伐门,先用手动方法,对各机构逐进行点动试车,然后用自动方法,进行一个循环试车,确认一切正常后,方可进行生产。
3、工作中还必须遵守:
a、
在设备开动后,一个循环未完成时,不许中途调整电器,以免发生误动作,造成设备人身事故;
b、
设备的每一个循环后,必须用喷咀清除芯盒上残存的砂子,并喷涂分型剂;
c、
在未切断电源和所气源前,不准将手伸入芯盒和夹紧器之间的空隙处,或把手放在导轨上,以免发生人身事故。
d、 一般不准空射,如必须空射,一定要把压缩空气伐门关小;
e、 如果用手操作,不准同时操作两个电器开关。
4、工作后还必须遵守:
a、
操纵各个电器开关,使设备各机构恢复到原始位置,然后切断电源和气源;
b、 折下射砂头,清理积砂和粘砂;
c、 清除排气塞内的粘砂;
d、
取下射砂筒,清除缝隙中的粘砂,最后用石蜡涂擦内壁,但不要将缝隙堵塞;
e、 清除闸板上的积砂,并在闸板上涂石墨粉,以减少磨擦;
f、 清除导轨和导杆上的积灰和积砂,并涂上一层润滑油。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条