说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 采输
1)  extraction and transportation
采输
1.
This paper elaborates the common troubleshooting in the extraction and transportation of low pressure natural gas as well as in the process,equipment and pipelines under the well,with relevant technological measures proposed to alleviate and gradually solve the problem.
阐述了低压天然气在采输过程中,以及在井下的工艺、设备、输气管线常出现的故障和产生原因,并提出了缓解和逐步解决的相关技术措施。
2)  exploration and transportation separately
分采分输
3)  Gather and input
采集输入
4)  gathering transmission
采集传输
1.
It is mainly developing from the three aspects such as gathering transmission,the concentrator and the backstage.
远程电力抄表系统在国内外现阶段的研究现状而言,主要是从采集传输、集中器和后台三个方面为重点进行的。
5)  blood collection and transfusion
采输血
1.
Objective To develop an one-off multifunctional instrument for blood collection and transfusion.
目的:设计开发出一次性多功能采输血器械,并说明其主要功能和操作方法。
6)  Brine extraction and transportation
采输卤
补充资料:"友谊"输油管道
      世界最大的原油输送管道之一。起自苏联鞑靼自治共和国的阿尔梅季耶夫斯克,经俄罗斯联邦共和国的欧洲部分,到达莫济里附近分为北部、南部两条支线管道。北部支线经布列斯特进入波兰,并延伸到民主德国;南部支线经乌日哥罗德进入捷克斯洛伐克和匈牙利。管道由直径为426、529、720、820、1020、1220毫米的管段组成,全长5327公里(其中苏联境内3688公里)。年输原油约1亿吨,是苏联向欧洲出口原油的主要通道。
  
  "友谊"输油管道是苏联、波兰、捷克斯洛伐克、匈牙利和民主德国共同兴建的。工程于1960年初开始,分两期进行。第一期工程于1964年完成,建成由阿尔梅季耶夫斯克经古比雪夫、乌涅查到莫济里的主线及北部、南部支线。修建中,管道逐段建成,逐段投产。第二期工程于1969年开工,采用逐段铺设副管、增建泵站,然后与一期工程的主管相连的方法,铺设了长为4412公里的副线。管道修建工程规模巨大,沿线穿过第聂伯河、德涅斯特河、维斯瓦河、奥得河、多瑙河等通航大河68条,穿越铁路122处,通过平斯克沼泽区和海拔1100米的喀尔巴阡山脉。第一期工程管道用钢量达73万吨。
  
  "友谊"输油管道采用密闭输油流程。沿线泵站安装有长输管道专用离心式油泵,采用串联泵流程,泵站出口压力为50~64千克力/厘米2。泵站间距为80~110公里。对泵站的控制采用程序控制方法,其程序控制项目包括改变流程时阀门的开启和关闭、泵的启停、泵压和输油温度、轴承温度的监测和电机的断电保护等。管道采用明线通信和无线电通信,利用沿线五国电话网进行生产调度。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条