1) staggering power consumption
错峰用电
1.
Station and action of staggering power consumption in power system operation;
错峰用电在电力系统运行中的地位和作用
2.
With the rapid growth of power consumption load,staggering power consumption has become one of the major tasks of dispatch department of power supply bureaus.
随着用电负荷的快速增长,错峰用电已成为供电局调度部门的主要工作之一。
2) peak load shifting
错峰用电
1.
Practice ol peak load shifting and restricting power use in Meishan Iron & Steel Co.,Ltd.;
梅山钢铁公司错峰用电实践
2.
Peak load shifting management system in shenzhen is designed and accomplished in order to assure the implementation of Shenzhen peak load shifting plan at the cost of least lost for scocial resources.
为在社会资源损失最小的情况下确保深圳市错峰用电计划有效落实,设计并实现了深圳地区错峰用电管理系统。
3) Peak load shifting and Power limiting
错峰限电
4) charge of stagger peak value
错峰充电
5) peak load cutting
避峰用电
1.
Methods and benefits of power consumption by peak load cutting for pumping units in oilfield;
油田抽油机避峰用电的方法和效益
补充资料:供电人要求用电人安全用电的权利
供电人要求用电人安全用电的权利:由于电力系统具有网络性,任何一个用电人的安全合理用电都关系到整个供电系统的安全。关系到社会的公共安全,所以,用电人应当严格按规定安全合理用电,不得违章用电、违约用电以免造成重大损害,用电人未按照国家的有关规定和当事人的约定安全用电的,造成供电人损害的,应当承担损害赔偿责任。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条