说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 错峰计划
1)  peak load shifting plan
错峰计划
1.
In order to meet the requirements of users as much as possible in case of being lack of power supply, an approach to obtain the optimal peak load shifting plan is proposed.
在存在电力供需矛盾时,为尽可能多地满足用户用电需求,结合我国实际情况,提出一种最优错峰计划生成方法。
2)  peak averting plan
避峰计划
3)  peak load shifting
错峰
1.
Analysis and research of peak load shifting in Nanjing City;
南京市错峰限电方法分析与研究
2.
An expression of nonlinear explicit function of dissatisfiability is given through analyzing the influencing factors on the dissatisfiability in peak load shifting to control power distribution.
通过分析错峰控制限电决策中的不满意度影响因素,给出了不满意度的非线性显函数形式;运用非线性多目标群决策理论,建立了非线性多目标群决策错峰控制限电模型,提出了一种交互式多目标加权解法,并且将有约束非线性规划模型化为无约束非线性规划模型;给出了求解的方法与步骤。
4)  peak shifting and averting
错峰避峰
1.
Improving peak shifting and averting efficiency by adopting advanced transmission media;
运用先进媒体介质 提高错峰避峰效率
5)  Plans that went wrong.
计划出了错误
6)  peak load shifting
错峰用电
1.
Practice ol peak load shifting and restricting power use in Meishan Iron & Steel Co.,Ltd.;
梅山钢铁公司错峰用电实践
2.
Peak load shifting management system in shenzhen is designed and accomplished in order to assure the implementation of Shenzhen peak load shifting plan at the cost of least lost for scocial resources.
为在社会资源损失最小的情况下确保深圳市错峰用电计划有效落实,设计并实现了深圳地区错峰用电管理系统。
补充资料:挨挨错错
1.谓拥挤杂乱。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条