说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 移动风险源
1)  moving hazard
移动风险源
1.
Case study shows that the emergency plan should be established by laying emphasis on prevention,paying attention to any moving hazards,establishing and strengthening precaution mechanism,and adopting emergency measures on multi-levels.
构建了饮用水水源污染事故应急预案的框架,通过实例分析提出,饮用水水源污染事故应急预案的编制应体现预防为主的思想,重视移动风险源,建立和强化预警和预防机制,采用分级响应的应急措施。
2)  transportable hazards
可移动危险源
1.
Based on the investigation of accidents caused by transportable hazards, the causes and situation of emergency rescue are analyzed and discussed.
在对可移动危险源事故案例的调研基础上,分析和探讨可移动危险源事故的原因及应急处置现状。
2.
During transportation, accidents could easily happen just because a lack of supervision to these transportable hazards, which threatened the security of people's life and property seriously and caused extremely bad influences on social economic development.
本文首先探讨并建立了可移动危险源事故的致因理论。
3.
The accidents of chemical transporting and social security accidents could easily happen , because of lacking of supervision to these transportable hazards and the work of effective emergency rescue being carried out in time after an accident,which threatened the security of people’s life and property seriously and caused extremely bad influences on social.
这些可移动危险源在运输过程中缺少动态的安全监控,事故发生后不能有效开展应急救援工作,因此对人民生命财产和公共安全构成了巨大威胁。
3)  mobile hazards
移动重大危险源
4)  risk transfer
风险转移
1.
Risk transfer system in international goods business;
国际货物买卖中的风险转移制度
2.
Research on the problem of goods risk transfer in the contract of trading;
关于完善买卖合同货物风险转移制度的研究
3.
Comparison Study on Risk Transfer under Breach in International Trade;
国际贸易中违约情况下风险转移制度的比较研究
5)  passing of risk
风险转移
1.
Probe into the Issue of Passing of Risk in International Sale of Goods;
国际货物销售风险转移问题探讨
2.
Research on the Passing of Risk under Breach in International Sales of Goods;
国际货物买卖中违约情况下的风险转移问题研究
3.
The following paper analyze and summarizes risk factors and risk affairs in the process of implementing international engineering,proposes risk control measures and preventive countermeasures,and introduces the measure for the passing of risk,in order to increase risk management level.
分析总结了国际工程实施过程中存在的风险因素和风险事件,提出了针对性的风险控制措施和预防对策,着重介绍了其风险转移对策,以提高风险管理水平。
6)  risk shift
风险转移
1.
The precautionary measures of the risk mainly are the risk control and the risk shift.
风险防范措施主要有风险控制和风险转移两种,风险控制必须贯穿于合同签订前、合同谈判签订阶段、合同履行时全过程3个阶段。
补充资料:风险投资的风险

风险投资的风险是指投资活动中人们不希望的后果出现的潜在可能性。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条