1) Xiaohaiba
小海坝
1.
Study on Biotic Monitoring mMethods of Water Contamination——A Case Study of Xiaohaiba of Yangliu town in Baoshan City;
水污染生物监测方法研究——以保山市杨柳乡小海坝为例
2) Xiaohai Dam
小海大坝
1.
This paper uses the finite difference method to simulate the tidal current fields of Sang-gou Bay where the Xiaohai Dam is opened or closed.
利用有限差分法,模拟了桑沟湾海域大潮期间小海大坝未打开与小海大坝打开后的潮流场。
3) Dahaiba reservoir and Xiaohaiba reservoir
大小海坝
4) Xiaohaiba reservoir
小海坝水库大坝
5) Daxiao Sea Dam Reservoir
大小海坝水库
1.
This paper carries on the appraisal to the water quality in Daxiao Sea Dam Reservoir in the fuzzy judgment method instead of the commonly used single index,describing the fuzzy water quality separatrix with the degree of membership and making the appraisal result to be more objective.
用模糊综合评价法,对大小海坝水库水质进行了评价。
6) The sea dam
拦海大坝
补充资料:海尔霍尔坝
海尔霍尔坝 |
Hell Hole Dam |
概 述 |
海尔霍尔坝位于加利福尼亚州鲁比肯(Rubicon)河上,距萨克拉门托市129km,是普莱瑟县中福克工程系统中的一项关键工程。坝基为辉长岩,坝址控制流域面积295km2,多年平均径流量4亿m3,有记录的洪峰流量188m3/s,总库容3亿m3,有效库容2亿m3,水库面积5km2。斜心墙堆石坝,最大坝高125m,坝顶长472m,坝轴线呈弧线形,曲率半径为1219m。上游坡为1∶2.5,下游坡为1∶1.4,上游坝面作成6m高的多级台阶。心墙上游坡为1∶1.57,下游坡为1∶1.34。无控制溢洪道溢顶为上溢式混凝土堰,最大泄量1960m3/s。利用导流隧洞改建成发电引水管和放水管。厂房布置在左岸岸边,装机容量725kW。工程于1966年完工,电站于1984年建成,后来将引水管道延长至下游17km的新电站,装机容量10.98万kW。 |