1) bottom water coning
底水锥进
1.
Commingled production of oil and water in bottom water coning reservoirs;
底水锥进油藏油水同采技术研究
2.
Main parameters affecting bottom water coning in heavy oil reservoir;
影响稠油油藏底水锥进的主要参数研究
3.
A Study on the elimination of barrier to bottom water coning;
夹层对底水锥进抑制作用的研究
2) bottom-water coning
底水锥进
1.
Study on the effect of interbed length on bottom-water coning by dynamic physical modeling experiments;
用动态物理模拟实验研究夹层长度对底水锥进的影响
2.
The mechanism of bottom-water coning in well and the shape of bottom-water coning through the barrier have been studied.
讨论了K H Coat的底水流模型 ,对底水绕过夹层时的累计水侵量进行了计算 ,分析了夹层所在的位置、大小和厚度对底水锥进的影响。
3) water coning
底水锥进
1.
According to a research thought of other authors,it is assumed that the pressures at an original oil-water contact are equal to original formation pressure and drainage boundary pressure respectively,and a model that incorporate radial flow and spherical flow is used to predict bottom-water coning.
借鉴前人研究思路,分别假设原始油水界面处的压力为原始地层压力和供给边界压力,采用径向流和半球面流相结合的模型预测底水锥进。
4) edge and basal water
边底水锥进
5) coning of basal oil
底油锥进
1.
In Jinzhou 20-2 condensate field,reasonable gas production rates determined by the conventional method have been used in production of reservoirs with basal oil,and the coning of basal oil occurred in some wells soon after their putting into production.
采用由常规方法确定的带底油凝析气藏气井合理产量进行生产,使得锦州20-2凝析气田某些气井在投产后很快出现了底油锥进。
6) gas and water coning
气水锥进
补充资料:140t/h梁底组合步进式加热炉(上海第二钢铁厂)
140t/h梁底组合步进式加热炉(上海第二钢铁厂)
、护‘:一步进式力口热霹
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条