2) bottom water coning
底水锥进
1.
Commingled production of oil and water in bottom water coning reservoirs;
底水锥进油藏油水同采技术研究
2.
Main parameters affecting bottom water coning in heavy oil reservoir;
影响稠油油藏底水锥进的主要参数研究
3.
A Study on the elimination of barrier to bottom water coning;
夹层对底水锥进抑制作用的研究
3) water coning
底水锥进
1.
According to a research thought of other authors,it is assumed that the pressures at an original oil-water contact are equal to original formation pressure and drainage boundary pressure respectively,and a model that incorporate radial flow and spherical flow is used to predict bottom-water coning.
借鉴前人研究思路,分别假设原始油水界面处的压力为原始地层压力和供给边界压力,采用径向流和半球面流相结合的模型预测底水锥进。
4) bottom-water coning
底水锥进
1.
Study on the effect of interbed length on bottom-water coning by dynamic physical modeling experiments;
用动态物理模拟实验研究夹层长度对底水锥进的影响
2.
The mechanism of bottom-water coning in well and the shape of bottom-water coning through the barrier have been studied.
讨论了K H Coat的底水流模型 ,对底水绕过夹层时的累计水侵量进行了计算 ,分析了夹层所在的位置、大小和厚度对底水锥进的影响。
5) gas and water coning
气水锥进
6) edge and basal water
边底水锥进
补充资料:140t/h梁底组合步进式加热炉(上海第二钢铁厂)
140t/h梁底组合步进式加热炉(上海第二钢铁厂)
、护‘:一步进式力口热霹
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条