1) low temperature application performance
低温施工性
2) low temperature construction
低温施工
1.
In order to solve the deficiencies of the usual treatments for excavation argillaceous-rock roadway in mining area,the application of microsurfacing in low temperature construction environment to treatment for excavation argillaceous-rock roadway in mining area is pointed out for the first time.
为改善矿区掘进巷道泥岩行车道现有处理对策的不足或不佳,首次提出了低温施工微表处系统在其处理中的应用问题。
2.
To affected the latex paint low temperature construction several factors to carry on the analysis discussion,and has carried on the experiment,finally proposed the suggestion enhanced the latex paint low temperature construction performance.
对影响乳胶漆低温施工的几个因素进行了分析讨论,并进行了实验验证,最后提出了乳胶漆低温施工性能改进的建议。
3) minimum application temperature
最低施工温度
1.
Experiments found that due to improper control of minimum application temperature for water emulsion coatings,finish quality in Shanghai area was affected considerably.
通过实验发现因对水乳型涂料的最低施工温度控制失当 ,使上海地区涂饰质量受到了影响。
4) welding at low temperature
低温焊接施工
1.
In view of the construction of Russia East Siberia-Pacific Oil Pipeline Project, some problems are reviewed in welding process evaluation,qualification examination of welders,scheme of construction period and welding at low temperature,construction experiences and lessons as well as proposals are considered of important reference for domestic pipeline construction companies.
针对远东(俄罗斯东西伯利亚—太平洋)管道工程建设实际,对该管道工程建设中焊接工艺鉴定、焊工资格认证、施工时间安排、低温焊接施工等问题进行了回顾,总结的施工经验与教训及提出的建议具有重要的参考价值。
5) low temperature plating
低温施镀
6) construction temperature
施工温度
1.
Influence of construction temperature on performance of giant reinforced concrete coal silo;
施工温度对巨型贮煤筒仓结构性能的影响
2.
Through analyzing the characteristics of modified asphalt and SMA pavement,the author discusses quality control measures in the construction of modified asphalt and SMA pavement construction from construction temperatures of modified asphalt and SMA pavement,and mixing,transportation,paving and rolling of modified asphalt and SMA mixture,in order to offer a reference for similar engineering.
通过分析改性沥青及SMA路面的特性,从改性沥青与SMA路面的施工温度、改性沥青与SMA混合料的拌制、运输摊铺及其碾压成型等方面探讨了改性沥青及SMA路面施工中的质量控制措施,以供类似工程参考。
3.
This paper introduces construction control elements of SBS modified bituminous mixture from construction temperature requirement,preparation work before construction,quality control of mixing mixture,paving,rolling and joint treatment,which to ensure safe and high-effective operation of modified bituminous pavement.
从施工温度要求、施工前准备工作、混合料拌合质量控制、摊铺、压实、接缝处理等方面介绍了SBS改性沥青混合料的施工控制要点,以保证改性沥青路面的安全、高效运营。
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条