1) offshore drilling and workover machines
海洋钻修井机
1.
Applying offshore engineering design methods and software such as SACS, AUTOPLANT and STRUCAD to the structural design of offshore drilling and workover machines used in Wenchang Oilfield Group boosts the whole technical and economic performances of these machines.
文昌油田群海洋钻修井机是中国海洋石油自主研发设计的第一个海洋钻修井机项目,该项目结构设计应用海洋石油工程设计方法和SACS、AUTOPLANT、STRUCAD等软件,提高了海洋钻修井机的整体技术经济性能。
2) ocean drilling machine
海洋钻修机
3) marine workover rig
海洋修井机
1.
Mainly,the possibility is analyzed for VARCO TDS-10SA top drive installed on model HXJ100 marine workover rigs,including power collocation,platform arrangement,mast height,and section size of mast.
介绍了顶驱装置的工作机理和结构特点,重点分析了在HXJ100型海洋修井机上安装VARCO TDS-10SA型顶驱的可行性,包括动力配置、平台布置、井架高度和井架截面尺寸等方面。
4) Offshore workover rig
海洋修井机
1.
Finite element analysis of a mast type derrick of 80 t offshore workover rig is carried out.
对 8 0 t海洋修井机井架进行了有限元计算。
5) ocean workover rig
海洋修井机
1.
The static design of ocean workover rig derrick based on Pro/E;
基于Pro/E的海洋修井机井架静态设计
6) offshore drilling
海洋钻井
1.
Development and application of a downhole control unit for offshore drilling;
海洋钻井井下控制装置的研制与应用
2.
Its history of using sea water drilling fluid technology in offshore drilling can be divided into several stages.
胜利石油管理局海洋钻井公司23年来,在渤海湾4870 km2的海域内,已打井348口,完成钻井进尺737866m。
3.
To prevent drilling tool collapse and inclination caused by hurricane on platfor m or to prevent accidents of kick or blowout induced by cement plug leakage within the wellbore, a special downhole tool, the downhole control unit used for offshore drilling of temporary shutdown for hurricane proof is develop ed.
为防止过大的台风易造成平台上钻具倒斜,或因井筒内水泥塞泄漏造成井涌或井喷等事故,开发研制出一种用于海上钻井过程中防台风临时关井的专用井下工具———海洋钻井井下控制装置。
补充资料:修慝
1.谓改正过错。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条