|
说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
|
|
1) Installation and debugging
安装调试
1.
Comprehensive automation system of 500 kV Gulu Substation and its installation and debugging;
500kV顾路变电站综合自动化系统及安装调试
2.
Expert system used in installation and debugging of hydraulic system;
液压设备安装调试中专家系统的应用
3.
The supervisory system of contact net load switch is introduced in Liupanshui hinge; moreover its method of installation and debugging and attentive key point are given combining with this system.
介绍了六盘水枢纽接触网负荷开关监控系统 ,并结合该系统给出了其安装调试的方法及其注意要
2) installation and adjustment
安装调试
1.
Repair, installation and adjustment of ZBS-H915F axial plunger pump;
ZBS——H915F轴向柱塞泵的维护安装调试
2.
Some Items that should be notice during technical negotiation when importing control systems of equipments was discussed in this passage by introducing a few special example in installation and adjustment of them on oil refining and chemical industry.
通过引进设备在安装调试中几个特殊实例 ,介绍引进设备自控系统在技术谈判中应注意的问题。
3.
The installation and adjustment of the eletric power transformers have to follow construction order and operating method.
电力变压器的安装调试运行必须遵循施工顺序和操作方法,达到现行的国家标准和验收规范的规定,方可运行生产。
3) installation and commissioning
安装调试
1.
Electric engineering installation and commissioning during technical conversion-problems and treatment;
电气工程安装调试中的问题及处理
2.
Transformation of 6000 Nm~3/h air separation plant for capacity enlargement is described in detail on scheme establishment,transformation content,the problems encountered in installation and commissioning,etc.
从方案制定、改造内容、安装调试及存在的问题等几方面详细介绍了6000 Nm3/h空分设备扩容改造情况。
3.
Based on the technological characteristics of salt making engineering,this paper elaborates problems that should been paid attention to in the installation and commissioning of instruments for temperature,pressure,flow and liquid level as well as necessary anti-blocking,anti-disturbing and anti-freezing protection measures that must be adopted for instruments measuring system.
本文就制盐工程的工艺特征,阐述了温度、压力、流量、液位的仪表安装调试时应注意的问题及仪表测量系统必需采取的防堵塞、防干扰、防冻保护措施。
4) installation debugging
安装调试
1.
In combination with the ventilation system transformation project of Shanxi Lanhua Group Jushan Coal Mine,some experiences are summarized about type selection and installation debugging of hot-blast stove in the well.
结合山西兰花集团公司莒山煤矿通风系统改造工程,总结了在井口热风炉选型和安装调试中的一些经验。
2.
Ltd,the experience of type-selection design and installation debugging of explosion-proof axial flow fan is summarized.
结合霍州煤电集团公司通风系统改造工程,总结了在防爆对旋轴流式通风机选型设计和安装调试中的一些经验。
3.
Combined with the modification project of ventilation system in Yangou Coal Mine of Leping Coal Mining Bureau, experience of typeselection design and installation debugging of explosionproof axial flow fan in relative rotation is summarized.
结合乐平矿务局沿沟煤矿通风系统改造工程,总结防爆对旋轴流式通风机在选型设计和安装调试中的一些经验。
5) fixing and debugging
安装调试
1.
Iinvestigate how to calculate the expenses of fixing and debugging the device.
通过介绍变频调速电机工作原理、变频装置的安装方法、调试程序 ,探讨安装调试所需费用的计
6) adjustment and installation
调试安装
补充资料:模具安装、调试及取卸作业规范
摘要:1 目的 通过对模具的安装、调试及取卸作业进行规范,从而确保设备、人身安全,并稳定生产出合格产品。 2 适用范围 本规范适用于模具的安装、调试及取卸作业。 3 作业要求 序号 作业程序 作业方法 注意事项 1 将滑块下降至下死点 A. 将行程 1 目的 通过对模具的安装、调试及取卸作业进行规范,从而确保设备、人身安全,并稳定生产出合格产品。 2 适用范围 本规范适用于模具的安装、调试及取卸作业。 3 作业要求 序号 作业程序 作业方法 注意事项 1 将滑块下降至下死点 A. 将行程选开关切换至“寸动”位置。B. 用“双手按钮”将滑块下降至下死点。 操作时注意观察曲轴的角度指示计,以确保滑块在过下死点1~2度位置停止。 2 查看冲床的装模高度 A. 查看模具的合模高度。B. 把冲床的装模高度调至高出模具的合模高度(如加垫铁,则加上垫铁高度)5~10mm。 如冲床的装模高度低于模具的合模高度或模具高度加垫铁厚度之和,则模具的安装调试时容易将模具损坏。 3 模具安装面的检查、修整及清理 A 要认真清理冲床滑块底面、工作台及模柄孔上的杂质和铁屑。B. 修整工作台及垫铁不平表面。C. 清理模具表面。D. 确认气垫装置。 A. 注意工作台表面是否凸凹不平,如不平用油石进行修整。B. 确认模柄固定螺栓是否完好。C, 使用气垫时确认气垫顶杆是否变形,放置位置是否适宜,长度是否适宜,是否夹废料。 4 模具放置在冲床的工作台上 A. 用适宜的搬运工具搬运模具。B, 滑块提升至上死点,放置模具。C. 确认模具的安装方向、结构、状态等。 搬运模具时将叉车的叉子放低后搬运模具。 5 模具的安装 A. 模具安装在工台中心,并调整位置、方向。B. 确认垫铁位置。C, 按下电机的“停止”按钮,当行程速度20SPM左右时,利用飞轮的惯性,慢慢下降滑块,将模柄装入滑块的模柄孔中。 A. 顺送模具送料方向的中心线与材料的中心线应保持一致。B. 确认模具的落料孔位置,以防被垫铁堵住。并避免垫铁之间跨距过大,造成模具变形。C. 注意利用“寸动”行程操作! 6 粗调闭合高度 A. 完全松开模柄螺栓。B. 下降滑块,使之靠上上模表面。 A. 用手推一推,查模具是否移动。B 必须在下死点进行操作。C. 有刻印、防弹凸台、弯曲、拉深模具必须放件进行调试。 7 固定上模 A. 首先确认模具固定装置。B, 对角固定模具2处或许处。C. 拧紧模柄固定螺栓。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条
|