4) tube well
管井
1.
Application of tube well (group wells) water dropping in construction of foundation;
管井(群井)降水在基础施工中的应用
2.
The dewatering method of well-points of the tube well is adopted.
工程采用了管井井点的降水方法,经过15天的降水,高炉基坑土方开挖后,土体基本干燥,边坡稳定,达到了预期的效果。
3.
In train unloading chutes foundation pit of Mongolia Huaqing Qinghai Coal Chemical Industry Park,we adopt precipitation technologies of the annular tube wells for the precipitation in the underground pit.
在内蒙庆华青海煤化工业园火车卸车槽基坑降水中,采用环状管井降水技术对该基坑进行地下降水,工程实施后降水效果明显,基坑开挖后土体固结良好,达到设计要求。
5) pipe well
管井
1.
An application case of pipe well dewater in foundation pit engineering;
基坑工程中管井井点降水的应用实例
2.
10 Huangzhuang station of Beijing subway, it introduces construction process of pipe well and leakage well, and summarizes construction course and emergency measures to be referred for similar engineering.
结合北京地铁十号线黄庄站降水施工,介绍了降水施工中的管井和引渗井的施工工艺,并对其施工过程及应急措施做了相应的总结,为类似工程的施工提供方案支持。
3.
The main dewatering method adopted in Beijing Television Center Project is pipe well point assisted by local seepage-well point.
北京电视中心基坑降水采用以管井井点抽水为主、局部渗井井点为辅,抽渗结合、配合区域明排水的施工方法,在基坑外侧布置大口径降水井86口,基坑内疏干井10口,基坑内加深坑抽渗减压井14口,有效地解决了降水问题。
6) tubular well
管井
1.
It is com pared with tubular well construction from drainage effect, moving operation and so on.
从排水效果、运行操作等方面与管井施工进行比较 ,如果取同深度的含水层水 ,水平井法是管井法排水量的三倍。