说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 规划
1)  planning [英]['plænɪŋ]  [美]['plænɪŋ]
规划
1.
Study on General Contingency Planning of Regional Oil Spill Incident with Related Equipment Base;
区域溢油应急设备库总体规划研究
2.
Planning Methods of Ecological Restoration for Coal Mining Area in China and Its Case Study;
中国煤矿区生态修复规划的方法与实例
3.
Study on production engineering measure planning;
采油工程措施规划方法研究
2)  plan [英][plæn]  [美][plæn]
规划
1.
The plan for the development of Zhejiang Province papermaking industry during the“ 11th Five-year Plan”;
浙江省造纸行业“十一五”发展规划
2.
Research on the 11th Five-Year Plan for SO_2 Pollution Control of Existing Coal-Fired Power Plants;
现有燃煤电厂二氧化硫治理“十一五”规划研究
3.
Environment protection while constructing Heilongjiang electric power network under' the 11th five-year plan';
“十一五”规划蓝图下的黑龙江省电网建设环境保护
3)  programming [英]['prəʊɡræmɪŋ]  [美]['progræmɪŋ]
规划
1.
Influential Factors Analysis and Countermeasures of Environmental Sanitation Programming of Small Towns;
小城镇环卫规划影响因素分析与对策
2.
Suggestion on index system construction for programming environmental impact assessment;
关于规划环评指标体系建设的建议
3.
The technique of whole processing management for medical equipment(1)—programming;
医疗设备全程管理技术(一)——医疗设备的装备规划和立项
4)  layout [英]['leɪaʊt]  [美]['le'aut]
规划
1.
Urban integrated park modification and replacement layout design discussion;
城市综合性公园改造与更新规划设计初探
2.
Extensive management phenomena analysis in the design and layout stage of the medium and small-sized cities;
中小型城市设计规划阶段粗放管理现象浅析
3.
Research of controlling layout design for expanding engineering of Hefei Arboretum;
合肥植物园扩建工程控制性规划设计研究
5)  program [英]['prəʊɡræm]  [美]['progræm]
规划
1.
Research on Non-quantification Factors of Garbage Disposal Program;
垃圾处理规划的非量化因素研究
2.
Formulating the Eleventh Five-year Program of hospital growth with the guidance of a scientific approach to development;
以科学发展观为指导 编制医院十一·五发展规划
6)  IT planning
IT规划
1.
Base on enterprise strategic, a new model of IT planning framework is explored in which the critical success factors (CSF) method and enterprise system planning (BSP) method is applied.
定位企业战略,运用关键成功因素法和企业系统规划法,本文探索了一种IT规划框架模型。
2.
Facing the problems existing in information construction,an architecture of IT planning was put up according to the strategies of IT planning,and the methods were proposed, which describe the perspective and gaps of IT construction and IT type selection.
本文针对制造业信息化建设过程中存在的难题,结合IT规划的原则策略,搭建企业IT规划的框架模型,提出IT建设远景与差距和企业IT选型的方法,并给出了选型的具体实例。
补充资料:规划
①比较全面的长远的发展计划:制订~丨十年~。②做规划:兴修水利问题,应当全面~。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条