说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 总价包干
1.
Discussion on measurement payment mode of overall contracted contract in total price contracting construction;
总价包干施工总承包合同计量支付方式的探讨
2.
The Total Insurance and Countermeasure of Lump Work for Engineering;
关于总价包干工程的风险及对策的探讨
3.
Auditing the Contracting Project of Fixed Total Price in Universities and Colleges;
浅谈高校固定总价合同包干工程的审计
4.
On Several Factors Affecting Construction Cost of Project in Total Contract Construction for Enterprises;
浅述影响企业施工总承包项目工程造价的若干因素
5.
Discussion on Some Problems about General Project Contracting;
我国发展工程总承包若干问题的探讨
6.
Study of Engineering Cost Management Based on General Contracting Model;
基于总承包模式的工程造价管理研究
7.
Fuzzy Comprehensive Evaluation of Risk for EPC Contract Project;
EPC工程总承包项目风险模糊综合评价
8.
Analysis of the Value Chain and the Advantages of the General Contractor Enterprises;
工程总承包企业价值链及其优势分析
9.
Evaluation Method of Core Competence of Construction General Contract Enterprise;
施工总承包企业核心竞争力评价方法
10.
Performance Evaluation of Construction Supply Chain in General Contracting Mode
总承包模式下建筑供应链的绩效评价
11.
Talking about the Cost Management and Control under EPC General Contracting Model
EPC总承包模式下的造价管理与控制
12.
Analysis of the Continuously Increased Overall Price Level in the Current Situation;
当前价格总水平持续上涨的若干分析
13.
Research on Problems in Construction General Contract of Large Engineering Project and Practice
大型工程项目施工总承包若干问题研究与实践
14.
All duties, taxes and other levies payable by the Contractor under the Contract, or for any other cause, as at the dateXXdays prior to the date for submission of tenders shall be included in the rates and amounts and total tender sum submitted by the tenderer.
在提交标书前28天承包人应付的关税、税收和其他税负应包括在单价和总价及投标总价中。
15.
It is a total evaluation of student's mastery of the field including the tools of research.
这是对学生研究心得包括研究工具的总评价。
16.
Manufacturing cost control for total contractingof domestic project construction
国内工程建设总承包过程中的造价控制
17.
The Value Engineering Analyses of the Cost Risks for the General Contract for the Olympic Stadiums Projects;
奥运场馆总承包成本风险的价值工程分析
18.
Study on Lump-sum Contracting Mode Based on the Value Innovation Theory;
基于价值创新理论的工程总承包模式研究