1.
Research on Operation Management and Energy Saving Measures of High-lift Step Pump Station
高扬程梯级泵站运行管理与节能措施
2.
Research on Optimal Operation of Multistage Pumping Stations in Donglei Ⅱ Yellowriver Puming Irrigation Project;
东雷二期抽黄梯级泵站优化调度研究
3.
Research on Operation Scheduling in Multi-stage Pumping Stations by Computer Simulation;
梯级泵站运行调度的计算机仿真研究
4.
Study on the appraisal indices of the technique management for large step pumping stations of South to North Water Transfer Project
南水北调梯级泵站技术管理评价指标研究
5.
Several Problems about Step Pump Stations in Eastern Route South-to-North Water Transfer Project
南水北调东线工程梯级泵站的几个问题
6.
Study on Optimum Operation of Multistage Pumping Stations Based on the Genetic Algorithm;
基于遗传算法的梯级泵站优化运行研究
7.
Study on Optimal Multi-stage Pumping Operation Models in Large-Scale Water Transfer Project;
大型引水工程梯级泵站优化调度模型研究
8.
In the light of characteristics of south-to-north water transfer project in the east of China, the requirements of step pump stations of the project for pump units are analyzed.
针对南水北调东线工程特点,分析了其梯级泵站对主泵机组的要求。
9.
Selection of adjusting operation modes of pump units for large step pump stations of the East Route Project of South to North Water Transfer
南水北调东线工程梯级泵站机组变工况方式选择
10.
Remote Monitor and Operation System in Sewage Interception Step Pump Station of Xili Reservoir (Northeast Line)
西丽水库(东北线)污水截排梯级泵站远程监视及操作系统
11.
Results are significant to reasonable design and selection of large step pump stations,structures and functions of pump unit equipments.
成果对大型梯级泵站形式和机组设备结构功能的合理设计选型有重大意义。
12.
Key Problems in Design of Pump System in Large and Medium Water Supply Pumping Stations with Long Distance Cascade Pressure Conduit
大中型长距离梯级有压管道供水泵站水泵系统设计关键问题总结探讨
13.
cascade hydroelectric power stations on Columbia River
哥伦比亚河梯级水电站
14.
Study on Optimal Scheduling Model and Algorithm of Cascaded Hydroelectric Power Plants;
梯级水电站优化调度模型与算法研究
15.
Hydraulic Transients Research of Diversion System in Cascade Hydropower Stations Connected by Open Channel;
梯级电站引水系统水力过渡过程研究
16.
The bidding model of cascaded hydropower stations considering reserve service in day-ahead market;
考虑备用的梯级水电站日前竞价模型
17.
Discussions on the Unified Price of Electricity Sent into Grid for Cascade Hydropower Stations;
流域梯级水电站统一上网电价的探讨
18.
Method of Cost Control for Developing Qingjiang Cascade Hydro-projects;
清江流域梯级电站建设投资控制方法