说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 钢岔管
1.
Optimization Design of Rib Reinforced Bifurcation of the Kalunghka Hydropower Station
卡隆卡水电站钢岔管结构优化与设计
2.
Research on high pressure-resistant bifurcated steel penstock embedded in anchor concrete block
设置在镇墩混凝土内的高压钢岔管结构研究
3.
Application of FORTRAN-APDL on finite element analyses for hydroelectric station bifurcated pipe
FORTRAN-APDL在水电站钢岔管有限元分析中的应用
4.
Study on the Design Method of Underground Crescent-rib Reinforced Branch Pipe
地下埋藏式内加强月牙肋钢岔管设计方法研究
5.
The Development and Research of the Computer-aided Design System of Spherical Forked Steel Tube in Plant;
水电站球形钢岔管计算机辅助设计系统开发与研究
6.
Development and Research on System for Computer Aided Design of Rib Reinforced Branch Pipe of Hydropower Station;
水电站月牙肋钢岔管计算机辅助设计系统开发与研究
7.
3-D Finite Element Analysis of Steel Bifurcation in Huaneng Baoxin Hydrostatic Project;
四川华能宝兴水电站地下钢岔管三维有限元分析研究
8.
Water Pressure Test on the Steel Bifurcation for Jiangsu Yixing Pumped Storage Power Station
江苏宜兴抽水蓄能电站引水钢岔管压水试验测试
9.
Testing for Residual Stress of Steel Bifurcated Pipe in Hydropower Station after Vibration Stress Relief by X-ray Diffraction Method
用X射线衍射法测定振动时效后水电站钢岔管中的残余应力
10.
Finite Element Simulation Analysis of Reinforced Concrete Bifurcated Pipe
钢筋混凝土岔管结构有限元仿真分析
11.
The 3D Finite Element Analysis of the Underground Reinforced Concrete Bifurcation Pipe
地下钢筋混凝土岔管三维有限元分析研究
12.
3-D Finite Element Analysis of the Symmetric Y-Type Reinforced Concrete Bifurcated Pipe
对称Y形钢筋混凝土岔管三维有限元分析
13.
Three-dimensional finite element analysis for the reinforced concrete bifurcation pipe in Luojiaohe Hydropower Station is carried out.
对落脚河水电站钢筋混凝土岔管进行了三维有限元分析。
14.
Analysis on Surrounding Rock Stability and Liner Structure for Underground High Pressure Reinforced Concrete Branch Pipe;
地下钢筋混凝土高压岔管围岩稳定与衬砌结构分析
15.
Study on the Working Behaviour of Underground Reinforced Concrete Bifurcated Pipe and Sensitivity Analysis of Parameters;
地下钢筋混凝土岔管的工作性态研究与参数敏感性分析
16.
Numerical Analysis on Surrounding Rock and Reinforced Concrete Bifurcation Structure of Underground Tunnels
地下水工隧洞围岩及钢筋混凝土岔管结构数值分析
17.
steel ball marshalling apparatus
钢球式道岔集中装置
18.
The stress and deformation of the reinforced concrete bifurcation with six combined operating conditions in the phases of construction and operating are calculated.
计算了在施工和运行过程中的6种组合工况下钢筋混凝土岔管的应力和变形。