说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 南水北调一期工程
1.
A Study on Building the System of Water Quality Monitoring--Take Shandong's first-stage of South-to-North Water Transfer Project for Example
水质监测管理系统建设研究——以南水北调一期工程山东段沿线为例
2.
Water Pricing Research on the First Stage Project of the Western Route of the South-To-North Water Transfer;
南水北调西线一期工程水价初步研究
3.
Eco-hydrological regionalization for water receiving areas of Phase Ⅰ Project of Mid-route of South-to-North Water Transfer Project
南水北调中线一期工程受水区生态水文分区
4.
Water Supply Cost Sharing and Calculating of the First Stage Project of the Eastern Route of the South-to-North Water Transfer;
南水北调东线第一期工程供水成本分摊与核算
5.
Study on Source Pump Station Optimal Operation of the First-stage Project of Eastern Route of South-to-North Water Transfer;
南水北调东线一期工程源头泵站优化运行研究
6.
Natural Eco-environment Comprehensive Assessment by Remote Sensing Technology in West Route Area of South-West Line Project
南水北调西线一期工程调水区生态环境质量遥感分析与综合评价
7.
ON THE FIRST STAGE OF EAST AND MIDDLE ROUTES OF SOUTH-TO-NORTH WATER TRANSFER PROJECT AND WATER PRICE POLICY IN THE WATER-RECEIVING AREAS
南水北调东中线一期工程及受水区水价政策探讨
8.
Analysis of Land Acquisition and Resettlement in the Henan Section of Middle-line First-phase Engineering of the South-to-North Water Transfer Project;
南水北调中线一期工程河南段建设征地与移民特点浅析
9.
Seepage Analysis on High Slope of Yellow River Tunnel Project in First-stage of Middle Route South-to-North Water Transfer Project
南水北调中线一期穿黄工程南岸渠道高边坡渗流分析
10.
Questionnaire survey and analysis on delay factors of China's South-to-North Water Diversion Project
南水北调工程工期影响因素的问卷调查及分析
11.
Model Acceptance Test of the Baoying Pumping Station in the South-to-North Water Project
南水北调东线一期工程宝应泵站水泵装置模型验收试验成果分析
12.
Study on Influences between River Flood and Structures Crossing Zhanghe River of the Middle Route of South-to-North Water Diversion Project in Phase-I
南水北调中线一期工程总干渠穿漳河建筑物洪水影响研究
13.
Ecological and Environmental Impact Analysis of First Phase of South-to-North Water Transfer Project on Water-recipient Areas
南水北调东、中线一期工程对受水区生态环境影响分析
14.
The Impact of the First Stage in East-Route of South-to-North Water Transfer Project on Ground Water along Liangji Canal
南水北调东线一期工程对梁济运河段地下水影响研究
15.
The Acceptance Test of the Model Pump Systerm of Linjiaba Pumping Station in the Eastern Route First-stage Project of the South-to-North Water Transfer Project
南水北调东线一期工程蔺家坝泵站水泵模型装置验收试验
16.
Some considerations about "water bank" of east route of South-to-North Water Transfer project based on option theory;
期权理论与南水北调东线工程“水银行”设想
17.
Technologies of Operation on Beijing-Shijiazhuang Section of Middle Route Project of South-to-North Water Diversion in Ice Period
浅议南水北调中线京石段工程冰期输水技术
18.
Study on the Structure of the Project of Yellow River Crossing Tunnel of South-to-North Water Diversion East Route in Phase I
南水北调东线第一期工程穿黄隧洞结构分析研究