1.
Research on Freight Demand and Lock Capacity of the Three Gorges;
长江三峡船闸过闸需求与通过能力研究
2.
Study on high excavated rock slope at TGP shiplocks
三峡船闸高陡岩石开挖边坡设计研究
3.
Numerical Simulation of 3-D Hydraulic Characteristics of Inlet for Three Gorges Project Lock
三峡船闸进水口三维水动力特性数值模拟
4.
Prototype Hydraulic Observation of Three Gorges Shiplock during Joint Trial Operation
三峡船闸系统联合调试期水力学原型观测
5.
The anchorage of the high side-slope of Three Gorges Ship Lock and the development of new non-bonded anchorage cable
三峡船闸高边坡锚固及新型无粘结锚索开发
6.
Study on the Identification and Evluation of the Major Hazard Sources of the Three Gorges Lock;
三峡船闸重大危险源的辨识与评价研究
7.
The MADM of three gorges ship gates running;
三峡船闸运行调度中的多属性决策问题
8.
Research on improving the traffic capacity of the TGP ship lock during the completion period
提高三峡船闸完建期通过能力措施研究
9.
Monitoring analysis on the seepage at curtain zone in permanent ship lock of TGP
三峡工程永久船闸帷幕区渗流监测分析
10.
MONITORING ANALYSIS ON PRESTRESS STATE OF ANCHOR CABLE OF HIGH SLOPE OF THE TGP PERMANENT SHIPLOCKS
三峡永久船闸高边坡锚索预应力状态监测分析
11.
Design of system Anchor rods for TGP permanent shiplock high slope
三峡工程永久船闸高边坡系统锚杆动态设计
12.
On the lining concrete design age of TGP permanent shiplocks
三峡永久船闸衬砌混凝土设计龄期探讨
13.
Study on Safety Monitoring Data Management System During Construction of TGP Permanent Lock
三峡永久船闸施工期安全监测数据管理系统
14.
Excavation Displacement Analysis by Distinct Element Method in Three Gorges Project;
三峡永久船闸高边坡开挖变形的离散元法分析
15.
The Lined Wall Design and Inspects of Three Gorges Permanent Navigation Lock;
三峡永久船闸砼衬砌墙结构设计与监测
16.
Study on Concrete Quality Control in the Floor the Three Structure of Gorges Project s Permanent Ship-locks;
三峡永久船闸地面工程混凝土质量控制与研究
17.
Evaluation and Analysis on High Side Slope Stability of Permanent Ship Brake in Three Gorges Project;
三峡工程永久船闸高边坡稳定性的评价与分析
18.
The Deformation Monitoring and Back Analysis of High Rock Slope of the Three Gorges Project Permanent Shiplock;
三峡工程永久船闸高边坡变形监测及反分析