1.
Optimization of Management and Implementation on Nuclear Equipment Quality Surveillance Work
核电设备监造工作管理与执行的优化
2.
Analysis and control on road transportation of nuclear power equipment
核电设备公路运输的风险分析与控制
3.
Standard Problem of Nuclear Power Localization in China;
核电设备国产化中的标准体系建设问题
4.
Prospect of Localization of Material for Nuclear Power Equipment in China;
中国核电设备材料国产化的前景及展望
5.
Quality Management Model and Implementation for Nuclea Rpower Equipment Manufacture
面向核电设备制造的质量管理模型及系统实现
6.
Application of strip cladding welding equipment for the nuclear power equipment manufactured
自动带极堆焊机在核电设备制造中的应用
7.
Devoting major efforts to indigenization of nuclear power equipment by right of project construction
以工程项目为依托,大力推进核电设备自主化
8.
Exploitation and foreign trade opportunity for equipment of nuclear power and wind power;
核电、风电设备的开发及其外贸机遇
9.
Design rules for mechanical components of pwr nuclear islemds
GB/T16702-1996压水堆核电厂核岛机械设备设计规范
10.
Welding of electric heating element used for pressurizer
核一级设备稳压器电加热元件的焊接
11.
Pilot study on risk informed categorization of structures,systems and components for nuclear power plant
核电站风险指引设备分级的试点研究
12.
Seismic qualification of electrical equipment of the safety system for nuclear power plants
GB/T13625-1992核电厂安全系统电气设备抗震鉴定
13.
RCM on Substation Equipment of Nuclear Power Station Research and Application
RCM在核电站变电设备检修中的研究与应用
14.
Lubrication and lifespan analysis for key equipment motor bearings in nuclear power plant
核电站关键设备电机轴承润滑与寿命分析
15.
Design and Function of Long Term Live Examination Field for UHVDC Equipments
特高压直流设备长期带电考核场的设计和功能
16.
Application of . NET technique in the invalid report system of nuclear power plant equipment
.NET技术在核电厂设备失效报告系统中的应用
17.
Seismic Behavior and Failure Mechanism of Auxiliary Equipments in Nuclear Power Generating Stations;
核电站辅助设备抗震性能破坏机理研究
18.
Research on Equipment Procurement and Supervision for Qinshan Nuclear Power Plant Phase Ⅱ;
秦山核电二期工程设备采购与监造管理研究