说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 深圳地铁
1.
Application of CFG pile on the No.3 line of Shenzhen subway
CFG桩在深圳地铁3号线中的应用
2.
TRB mode analysis of metro vehicles in Shenzhen Metro Phase 1
深圳地铁一期工程地铁车辆TRB模式分析
3.
On Shield Method Construction Techniques of Shenzhen Metro Crossing-railway Interval Tunnel
深圳地铁穿越铁路的区间隧道盾构法施工技术
4.
Research on Deformation Rule of Deep Excavation with Top-down Construction Method in Shenzhen-metro Laojie Street Station;
深圳地铁老街站逆作法深基坑变形规律研究
5.
A Technique of Forming Dent into Rock Layer for Underground Diaphram Wall
深圳地铁福民站地下连续墙入岩成槽技术
6.
Construction and cost analysis of underground continuous wall beneath Fumin station of Shenzhen Metro;
深圳地铁福民站地下连续墙施工及成本分析
7.
Construction of Underground Diaphragm Wall in HUAXIN Station of SHENZHEN Metro
浅谈深圳地铁华新站地下连续墙施工技术
8.
Study on Tunnel Piston Wind in Shenzhen Metro Xiangmihu Island Station;
深圳地铁香蜜湖岛式车站的隧道活塞风研究
9.
Finite Element Analysis on the Retaining Structure Architectural Structure of Foundation Pit in the LuoHu Station of the ShenZhen Metro;
深圳地铁罗湖站基坑支护结构体系有限元分析
10.
Technical Study on Observational Method Applied to Superposed Dural Tunnel of Shenzhen Metro;
深圳地铁重叠隧道信息化施工技术研究
11.
Study on Dichophase Project Financing Mode of Shenzhen Metro Line 4;
深圳地铁4号线二期工程项目融资模式研究
12.
The Impact of URRT on House Prices in Shenzhen;
深圳地铁建设对站点周边住宅价值的影响
13.
Design of anchored soil nailed walls at Cultural Centre Station of Shenzhen Metro;
深圳地铁文化中心站土钉墙锚索组合支护设计
14.
Practice of Strategy-Benchmarking Management in Shenzhen Metro Group
深圳地铁集团战略标杆管理的探索与实践
15.
Research on the Numerical Simulation of Subsidence of Existing Tunnel Caused by Adjacent Metro Tunnel Construction in Shenzhen
深圳地铁隧道邻接施工沉降数值模拟研究
16.
Non-blasting Excavation Method with Expanding Agent Used in Shenzhen Metro Tunnel Construction
深圳地铁隧道施工的膨胀剂非爆破开挖方案
17.
Design of auxiliary system for Shenzhen Metro Line 1 extension
深圳地铁1号线续建工程车辆辅助系统设计
18.
Fireproof design of metro vehicle for Shenzhen Metro Line 1 express
深圳地铁一号线增购项目车辆的防火设计