说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 阶梯式溢洪道
1.
Discharge Test of Flexible Lining Stepped Spillway and Analysis of Hydraulic Characteristics
柔性衬护阶梯式溢洪道过水试验与水力特性分析
2.
Calculation of aerated water depth and energy dissipation rate of a pre-aerator stepped spillway
前置掺气坎式阶梯溢洪道掺气水深及消能率的计算
3.
Experimental investigation on the pressure characteristics of skimming flow on stepped spillways
台阶式溢洪道滑行水流压强特性的试验研究
4.
Study on the characteristics of time-average pressure of skimming flow in stepped spillway
台阶式溢洪道滑行水流时均压强特性研究
5.
multi-level outlet shaft spillway
多层进水竖井式溢洪道
6.
The energy dissipation rate is 40 to 70% higher than that of the skimming spillway.
在试验范围内,台阶式溢洪道与光滑溢洪道比较,消能率可以提高40% ~70%。
7.
escalator tunnel
阶梯式自动电梯隧道
8.
Experimental Research on the Presented Water-Surface Curve of Skimming Flow on Stepped Spillways and Energy Disspation
台阶式溢洪道滑行水流水面线和消能效果的试验研究
9.
Water Flow Regime and Flow Velocity Behaviors in Stepped Spillways with Aerated Piers
掺气分流墩台阶式溢洪道的水流流态和流速特性
10.
Model Study on Hydraulics of Air-Entraimented Flow on Stepped Spillways;
台阶式溢洪道强迫掺气水流水力特性的试验研究
11.
Test Study on the Upstream Partof Side Channel Spillway and Stepped Spillway of the First Step Hydropower Stationin in Gang-Qu River;
岗曲河一级水电站侧槽溢洪道上游部分及台阶溢洪道试验研究
12.
Characteristics Research of the Spillway Discharge on Overflow Concrete Face Rockfill Dam;
溢流式面板堆石坝坝体溢洪道泄流特性研究
13.
EXPERIMENTAL RESEARCH ON THE SLIDING RESISTANCE OF ROCK FOUNDATION OF A SIDE SPILLWAY
岸边式溢洪道岩基抗滑稳定??研究
14.
Water flow regime and flow velocity behaviors in stepped spillways with aerated piers are studied via the model tests.
通过模型试验 ,研究了掺气分流墩台阶式溢洪道的水流流态和流速特性。
15.
1. There are two flow forms in the stepped spillways , which are skimming flow and jet flow.
1:研究表明台阶式溢洪道的水流流态可以分为跌落流和滑行流两种流态。
16.
EFFECT OF STEPPED SPILLWAY ON CONTAMINATION WATER BODY WITH DIFFERENCE CONCENTRATION
阶梯式溢流堰对不同浓度污染水体的影响研究
17.
Study on Stress of Intake Head in Ski-jump Spillway of Arch Dam
拱坝滑雪道式溢洪道进口闸首的应力研究
18.
Experimental study of drop shaft spillway reconstructed by diversion tunnel
导流洞改建为跌流式竖井溢洪道的试验研究