1.
Put into Operation for Standards and Effect of Pingban Hydropower Station Project;
平班水电站工程达标投产工作体会及成效
2.
Major Measures and Achievements on Investment Control and Cost Reduction for Pingban Hydropower Station Project;
平班水电站工程投资控制及降低工程造价的主要措施和成效
3.
Optimization of concrete mix proportion for main work Contract B of Pingban Hydropower Station
平班水电站主体工程B标混凝土配合比优化设计
4.
Application Technology of Synthesis Automation Level Improvement in Nobody Stands Substation
提高无人值班变电站综合自动化水平应用技术
5.
Analysis of cracks on cement poles of Taipingwan hydropower station and its reinforcement
太平湾电站变电站水泥杆裂缝分析及加固
6.
The Applications of Water-prospecting by Electrical Method in Pingguo Substations
电测深法在平果变电站找水中的应用
7.
Optimization of Hydropower Tunnel Upper Flat Pipe Section Support for Hydropower Station
水电站引水发电隧洞上平管段支护优化研究
8.
Estimation of Adit Dirt Volume in Longtan Hydropower Station Dam Area
龙滩水电站坝址区平洞结垢量的估算
9.
Experimental investigation of the side wall deformation in the PCP region of a utility boiler
电站锅炉水平侧包墙变形的试验研究
10.
Influence of Pushihe flood to tail water level of taipingwan hydropower station
蒲石河洪水对太平湾水电站尾水位的影响
11.
Study on the Water Seal Layout at the Bulb Tubular Powe Station
灯泡贯流式水电站厂房水平止水布置研究
12.
Unattended Substation and Substation Automation
无人值班变电站与变电站自动化
13.
Small Disturbance Stability Test on Single Unit of Pingban Hydropower Station
平班水电厂单机小扰动稳定性试验研究
14.
Influence of flood from Pushi river on flood discharge of Taipingwan hydropower station
蒲石河洪水对太平湾水电站泄洪的影响
15.
floating power barge
水上动力站水上发电站
16.
Study of Main Slope Erosion Dynamic Processes on Project Area of Banduo Hydropower Station of Yellow River
黄河班多水电站工程区主要地类坡面侵蚀动力学过程试验研究
17.
Experimental Study of Runoff Processes on Waste Grassland in Project Area of Banduo Hydropower Station of Yellow River
黄河班多水电站工程区荒草地坡面产流过程试验研究
18.
Research and Realization of Cross-Platform Hydropower Station Based on Web;
基于web的跨平台水电站系统研究与实现