说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 金塘大桥
1.
Recommendations for the Power Supply and Distribution Design along Jintang Bridge and Xihoumen Bridge
金塘大桥和西堠门大桥沿线供配电设计的建议
2.
Survey Control Technology for the Continuous Box Girder Construction of JIN TANG Bridge
金塘大桥连续箱梁架设测量控制技术
3.
The Installation Technology of Support Saddle over the Non-navigable Span of Jintang Bridge
金塘大桥非通航孔桥支座安装施工技术
4.
Optimization of the Jintang Bridge's axis and the influence of the bridge on the water flow and navigation channel
金塘大桥桥轴线优化及建桥对水流和航道的影响
5.
The Study of Shear Conecting Behavior in Anchorage Zone of Pylon of Jintang Bridge
金塘大桥索塔锚固区段剪力连接行为研究
6.
Construction technology of Jintang large Bridge non-navigable span cast-in-place pier body template
金塘大桥非通航孔现浇墩身模板施工技术
7.
Cracking Control Technique of Concrete Structure in Splash Zone of Jintang Bridge
金塘大桥浪溅区混凝土结构的裂缝控制
8.
Installation and System Conversion of 60 m Precast Box Girder of Jintang Bridge
金塘大桥60m预制箱梁的安装与体系转换
9.
Conceptual Design and Analysis of Continuous Rigid Frame Bridge Project for East-Navigable Spans of Jintang Bridge;
金塘大桥东通航孔连续刚构桥方案设计分析与研究
10.
Theoretical Elongation of Prestressing Cable of Non-navigable Span of Jintang Bridge
金塘大桥非通航孔桥预应力束的理论伸长量计算
11.
Analysis of Cause of Cracks of Joints of Jintang Bridge Box-girder and Their Prevention and Control Measures
金塘大桥箱梁湿接头裂缝的原因分析与防治措施
12.
Research about Construction Technique of Anti-Slipping Frusta in Long Tang Mountain;
龙塘山三号大桥抗滑墩施工技术研究
13.
The Large Bridge at the world famous strong tide river part-The site scene during construction period of the2 nd Qiantangjiang River Bridge.
世界著名强涌潮河段的首座大桥——钱塘江第二大桥在施工期的场景。
14.
The Construction Techniques of Skid Resistance Plers of Longtang Shan No.3 Bridge in Neikun Railway;
内昆铁路龙塘山3#大桥抗滑墩施工技术研究
15.
Experimental research on pile-base post-grouting piles of qiputang bridge
桩端后压浆在七浦塘大桥桩基中的试验研究
16.
The cast-in-place prestressed continuous box beam construction of Heyetang super large bridge
荷叶塘特大高架桥现浇预应力连续箱梁施工
17.
FATIGUE CHECK-CALCULATION AND ASSESSMENT OF REMAINING LIFE FOR QIANTANGJIANG BRIDGE
钱塘江大桥疲劳检算和剩余寿命评估研究探讨
18.
Monitoring of Construction of cable-Stayed Bridge with 120 and 120m of Jinzhouwan bridge's main Bridge
金州湾大桥主桥120+120m斜拉桥施工监控