1.
Pipe supports and hangers Part 1: Technical specification
GB/T17116.1-1997管道支吊架第1部分;技术规范
2.
Code for design of piping support and hanger in petrochemical industry
石油化工企业管道支吊架设计规范
3.
The Research and Implementation of Pipe Support CAD Software in Plant Design;
工厂管道支吊架CAD软件的研究与实现
4.
Analysis of the Reason for Support-hangers of Steam-water Piping Failure in Thermal Power Plant
电厂汽水管道支吊架失效原因的分析
5.
Optimal adjustment of supports & hangers of hot reheater steam pipe
再热蒸汽热段管道支吊架的优化调整
6.
Petrochemical Pipeline Stress Analysis and Supports & Hangers Design Sumary
石化管道应力分析及支吊架设计综述
7.
Pipe supports and hangers Part 2: Pipe attachments
GB/T17116.2-1997管道支吊架第2部分:管道连接部件
8.
Cause Analysis and Treatment of 600 MW Units Reheat Pipe Hanger Curving
600 MW机组热段管道支吊架变形原因分析及处理
9.
Study on Support and Hanger Layout of Complex Piping Stress Analysis
复杂管道应力分析中的支吊架布置方法
10.
Pipe supports and hangers Part 3: Middle connection attachments and building structure attachments
GB/T17116.3-1997管道支吊架第3部分:中间连接件和建筑结构连接件
11.
trussed beam plough
吊挂式犁 -带有支撑架的
12.
pylon diagonal drag brace
吊臂架交叉阻力支撑条
13.
Position the lower suspension arm at the axle bracket and rear bracket.
把下端悬吊臂放在车轴支架和后侧支架上。
14.
The bracket was disassembled by swinging scaffold from down to up.
支架通过吊篮设备由下至上进行拆卸。
15.
Remove the upper suspension arm nut and bolt at the axle bracket.
从车轴支架上拆去上端悬吊臂螺帽和螺栓。
16.
Remove the lower suspension arm nut and bolt from the axle bracket.
从车轴支架上拆去下端悬吊臂螺帽和螺栓。
17.
Analysis of Temporary Bracket under Construction of Steel Box Girder Hoisting in Sutong Bridge;
苏通大桥钢箱梁吊装临时支架结构分析
18.
The box arched bridge without support single base rib closure lift technology
箱形拱桥无支架单基肋碰撞合龙吊装技术