1.
The blasting parameter calculation of the technology is analyzed with the discussion on the rock excavation of the first foundation in next floodgate of Bailongtan hydroelectric power station.
结合百龙滩水电站下闸首基础石方开挖工程,详细介绍了该技术的爆破参数计算。
2.
Estimation of Adit Dirt Volume in Longtan Hydropower Station Dam Area
龙滩水电站坝址区平洞结垢量的估算
3.
Financing for the Longtan Hydropower Project and its funds management;
龙滩水电站工程融资和资金使用管理
4.
Optimization of Protection Configuration for 10kV Station Transformers of Longtan Hydropower Station
龙滩水电站10kV厂用变保护的优化配置
5.
Test and Research on Exceptional Noise of #1 Generator in Bailongtan Hydropower Plant;
百龙滩水电厂#1发电机组异音测试研究
6.
Discussion on Favoring the People of Relocation by Aquatic Breeding in Luodian Reservoir of Longtan Hydropower Station;
龙滩水电站罗甸库区水产养殖反哺移民的探讨
7.
RCC Engineering Technique Applied to Intake Section of Longtan Hydropower Station
龙滩水电站进水口坝段碾压混凝土施工技术
8.
Turning and treatment of turbine guide bearing throw of Unit 5 in Longtan Hydropower Station
龙滩水电站5号机组盘车与水导摆度处理
9.
The application of smooth blasting in drainage tunnel construction of Longtan hydropower station
光面爆破在龙滩水电站排水洞施工中的应用
10.
Concrete Temperature Control for Intake Dam Section of Longtan Hydropower Station
龙滩水电站进水口坝段混凝土温度控制
11.
Contact grouting construction for intake steel linings on left bank of Longtan Hydropower Station
龙滩水电站左岸进水口钢衬接触灌浆施工
12.
Application of Stator Ground Protection with Extra Power Supply in Longtan HydroPower Station
外加电源式定子接地保护在龙滩水电站的应用
13.
Excavation technology of three large chambers at Longtan Hydropower Station
龙滩水电站地下三大洞室开挖技术浅析
14.
Study on Construction Scheme of High Roller Compacted Concrete Dam for Longtan Hydropower Station;
龙滩水电站高碾压混凝土坝施工方案研究
15.
Possibility of Construction Schedule for Longtan Hydropower Project;
龙滩水电站大坝施工进度的可能性研究
16.
Discussions on several major problems in the work of land requisition and resettlement for the Longtan Hydropower Project;
龙滩水电站征地移民工作中几大问题的探讨
17.
Brief Introduction of Smooth Transition from Project Construction to Production of Longtan Hydropower Station
龙滩水电站工程从建设向生产运行的平稳过渡
18.
Application of Safety and Stability Control Device to Longtan Hydropower Station on the Southern Power Grid
南网龙滩水电站安全稳定控制装置的应用