1.
Several negligible problems during the modification claim work;
浅议变更索赔工作中容易忽视的问题
2.
Studies on International Contract Management and Variation/claim Resolution;
小浪底国际标合同管理及变更索赔处理研究
3.
Differentiation Relationship and Application of Engineering Change and Claim
工程变更与索赔的辩证关系及其运用
4.
Research on Design Alteration and Construction Claimant of Building Project;
建筑工程设计变更与施工索赔问题的探讨
5.
On Techniques of Variation and Claim of Construction Management under Projects Financed by World Bank;
论世行贷款项目施工管理的变更与索赔技巧
6.
Contract Variation and Claim Management of Zhuzhou Navigation-Power Junction s Lock Project;
株洲航电枢纽船闸工程合同变更与索赔管理
7.
Study about the Claim on Modification in Reinforcement Works in Irrigation Project;
水利工程加固项目施工变更的索赔研究
8.
A probe into alteration and claim activities of construction enterprisesunder the FIDIC contract condition;
施工企业在FIDIC合同条件下变更与索赔工作初探
9.
Analysis of project variations and claim accord- ing to the FIDIC contract clauses;
FIDIC施工合同项目中工程变更与索赔分析
10.
The successful management in modification and claim has a direct influence on the time limit and ultimate costs for a project.
变更和索赔的成功管理直接影响到工程项目的工期和最终成本。
11.
Study on Comprehensive Evaluation Model of Hydraulic Engineering Change and Construction Claim Support System
水利工程变更综合评价模型与施工索赔支持系统研究
12.
On the Development of Korea s Claim to Japan for Damages after WorldWar II;
试论二战后韩国对日索赔要求的演变
13.
To send in one 's claim for compensation
提出索赔,要求索赔
14.
An Asymptotic Relationship for Survival Probability in Renewal Risk Model Under Heavy-tailed Claims;
重尾索赔下更新风险模型生存概率局部估计解
15.
Insurance, Claims and Compensation Sectio
保险、索赔和赔偿科
16.
may seek compensation from the enterprises which have taken over the rights and obligations of the original enterprises following the reorganization.
可以向变更后承受其权利义务的企业要求赔偿。
17.
to complain to somebody of something
就……向……提出索赔
18.
Quality claim strongly recommend you agree otherwise bigger loss possible elsewhere
品质索赔要求强烈,建议贵公司同意,否则在其它方面可能损失更大。