1.
Study of the Characteristics of Frozen Wall Formation in the Ultra-Long Horizontal Freezing Process of a Subway Construction
地铁超长水平冻结法冻结壁形成特性研究
2.
The Temperature Field Study on Cup-shaped Freezing Soil Wall of Horizontal Freezing Reinforcement for Shield Tunneling Setting Out
盾构出洞水平冻结加固杯型冻土壁温度场研究
3.
3-D finite element analysis of melting temperature field in hield tunneling horizontal freezing reinforcing engineering
盾构出洞水平冻结解冻温度场三维有限元分析
4.
Numerical Simulation of Temperature Field of Frozen Soil by Artificial Ground Freezing with Two Circle Horizontal Tubes
双圈水平冻结冻土帷幕温度场数值模拟
5.
Analysis of influencing parameters of temperature field within freezing wall of subway tunnel construction with horizontal ground freezing
地铁隧道水平冻结法施工冻结壁温度场影响参数分析
6.
Study on Theory and Test of Tunnel Construction by Artificial Horizontal Freezing Method;
人工水平冻结法隧道施工理论与试验研究
7.
Horizontal Freezing Method Applied to By-pass in the Shanghai Underground Railway System;
水平冻结法在上海地铁隧道旁通道工程的应用
8.
Study on Stress Theory of Double Tunnel Construction by Horizontal Frozen Mining Method
水平冻结暗挖地铁双线隧道受力机理研究
9.
Study on Thermal-Solid Coupling of Horizontal Freezing Soil for Cross Passage in Metro Tunnels
地铁联络通道水平冻结土体热固耦合研究
10.
MODEL TEST ON DISPLACEMENT FIELD OF DOUBLE-ROUTE METRO CONSTRUCTED WITH HORIZONTAL FREEZING METHOD
地铁双线隧道水平冻结位移场的模型试验
11.
Analysis and Application of Horizontal Ground Freezing Drilling-hole Trajectory in Construction of Metro Bypass
地铁旁通道水平冻结钻孔轨迹分析及应用
12.
Technique of Theodolite for the Horizontal Ground Freezing Hole in Construction of Metro Bypass
隧道旁通道工程水平冻结孔经纬仪测斜技术
13.
Freezing Construction of Cross Passage of Shanghai Yangtze River Tunnel
上海长江隧道连接通道水平冻结法施工
14.
AStudy of the Construction Technology of Horizontal Frozen Hole in the Adjacent-channel in Instable and Complex Formation
复杂不稳定地层条件下旁通道水平冻结孔施工工艺研究
15.
Design and Research of Using Horizontal Freezing Hole Fiber-Optic Gyroscope Inclinometer in Municipal Engineering
市政工程用水平冻结孔光纤陀螺测斜仪的设计研究
16.
EXPERIMENTAL RESEARCH ON WHOLE-SECTION EXTRA-LONG HORIZONTAL FREEZING DISPLACEMENT IN SHALLOW-BURIED TUNNEL
浅埋隧道全断面超长水平冻结位移场的试验研究
17.
His salary was frozen at 200 dollars per week.
他的薪水冻结在每周二百美元的水平上。
18.
horizontal plate contact freezer
卧式平板接触式冻结机