说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 向家坝水电站
1.
Stability Analysis Against Deep Sliding of the Dam Foundation of Two Dam Section for Xiangjiaba Hydropower Station;
向家坝水电站两个坝段坝基深层抗滑稳定分析
2.
Installing Technique of A Style Tower Cable Crane for Xiangjiaba Hydropower Project
向家坝水电站A型塔架式缆机安装技术
3.
Sensitive Analysis of Temperature Control Mesures of the Concrete Dam for Xiangjiaba Hydropower Station;
向家坝水电站大坝混凝土温控措施敏感性分析
4.
Investigation on stability against deep level sliding of Xiangjiaba hydrostation gravity dam
向家坝水电站重力坝深层抗滑稳定性研究
5.
Dam Partition Temperature Control for Left Bank of Xiangjiaba Hydropower Station
向家坝水电站左岸坝体分缝温度控制研究
6.
Research on Tailrace System of Tunnel with Sloping Ceiling in Right Bank Underground Hydropower Station;
金沙江向家坝水电站右岸地下电站变顶高尾水系统研究
7.
Study on Simulation and Optimization for the Construction Diversion Process of Xiangjiaba Hydropower Station;
向家坝水电站施工导流过程仿真与优化研究
8.
Dynamic Visualization Construction Diversion of XiangJiaBa Hydroplant;
向家坝水电站施工导流动态可视化研究
9.
Resistance Monitoring in Construction of Caisson Foundation of Cofferdam of Xiangjiaba Hydropower Station
向家坝水电站围堰基础沉井施工下沉阻力监测
10.
Curtain Grouting Test at Underground Powerhouse at Right Bank of Xiangjiaba Dam
向家坝水电站右岸地下厂房帷幕灌浆试验
11.
Simulation Analysis on Navigation Indexes of Xiangjiaba Bridge by Ship Model Test
向家坝水电站施工大桥船模通航指数模拟分析
12.
Gas safety and prevention in excavation construction of Xiangjiaba Hydropower Station
向家坝水电站开挖工程中的瓦斯安全预防
13.
Simulation and Optimization on the Dam Construction Schemes of Xiangjiaba Hydropower Station;
向家坝水电站大坝浇筑施工方案仿真分析与优化设计
14.
Dynamic Three-Dimension Visual Simulation for Xiangjiaba Hydroplant Dam Concrete Construction;
向家坝水电站大坝施工动态三维可视化仿真研究
15.
The link from the Xiangjiaba hydropower plant to Shanghai is scheduled for completion in 2011.
这条从向家坝水电站到上海的电力线预计在2011年完工。
16.
Study on Construction Simulation and Optimization for the Underground Powerhouse System of Xiangjiaba Hydropower Station;
向家坝水电站地下厂房系统施工仿真与优化研究
17.
Study on curtain grouting scheme and technology for construction of underground powerhouse on right bank of Xiangjiaba Hydropower Station
向家坝水电站右岸地下厂房施工帷幕灌浆方案与技术研究
18.
Control blast technology for slope excavation works above EL. 300m on left bank of Xiangjiaba hydropower project
向家坝水电站左岸300m高程以上边坡开挖工程施工控制爆破技术