说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 景洪电站
1.
Jinghong hydropower station RCC dam is in the subtropics zone, the high temperature continues very long and the temperature control in dam construction is very difficult.
景洪电站地处亚热带,高气温时间长,大坝碾压混凝土施工温控难度高。
2.
The Machining Technology of Runner at Site of Jinghong Hydropower Station
景洪水电站水轮机转轮工地加工技术
3.
Study of concrete deformation and heat performance for Jinghong hydropower station
景洪水电站混凝土变形性能及热学性能研究
4.
Shaking Table Model Test of Ship Lift Tower in Jinghong Water Power Station
景洪水电站升船机塔楼的振动台模型试验
5.
Study of Heat Transfer Performance in Dam Tunnel and Network Nodes Simple Analysis of Ventilation Tunnel in Jing Hong Hydropower Station;
坝体廊道换热效果研究及景洪水电站通风廊道网络节点法初探
6.
Heat Transfer Analysis of Tunnel Ventilaton-Theoretical and Numerical Study of Heat Transfer in Underground Tunnel of Jing-hong and Nuo-zha-du Hydropower Station;
廊道通风换热过程分析—景洪、糯扎渡水电站坝体廊道通风理论与数值模拟研究
7.
Influence of flood from Pushi river on flood discharge of Taipingwan hydropower station
蒲石河洪水对太平湾水电站泄洪的影响
8.
The Hydraulic Model Test on Outlet Works and Energy Dissipation for Chardara Hydropower Station;
Chardara水电站泄洪消能模型试验研究
9.
Study on Engineering Project Financial Management of Hongjiadu Hydropower Station;
洪家渡水电站工程项目财务管理探讨
10.
Study on Changheba Hydropower Station Flood Discharging Works Layout
长河坝水电站泄洪建筑物的布置研究
11.
Tests and research on aeration and corrosion reduction for spillway of Bakun hydropower station
巴贡水电站溢洪道掺气减蚀试验研究
12.
Rock slide treatment for spillway tunnel of Chahanwusu Hydropower Station
察汗乌苏水电站溢洪洞洞室塌方处理
13.
Test Study on the Upstream Partof Side Channel Spillway and Stepped Spillway of the First Step Hydropower Stationin in Gang-Qu River;
岗曲河一级水电站侧槽溢洪道上游部分及台阶溢洪道试验研究
14.
Hongjia Ferry hydropower station is a tap station of wujiang River step exploitation in Guizhou province.
洪家渡水电站是贵州省乌江梯级开发的一个龙头电站。
15.
The builders of the power station decided to race against the floods.
建设电站的工人下决心抢在洪水前完成任务。
16.
Evaluation on slope stability of a hydroelectric station spillway,Lancang River
澜沧江某水电站泄洪洞出口边坡稳定性评价
17.
Optimization and organization on excavation and construction of the left abutment of Hongjiadu Hydropower Station
洪家渡水电站左坝肩开挖施工优化与组织
18.
Dam Body Filling Design by Stages for Concrete Face Rock-fill Dam of Hongjiadu Hydropower Station
洪家渡水电站面板堆石坝坝体填筑分期设计