1.
OPTIMIZATION TRANSFORMATION IN 1750 BLAST FURNACE SLAG SYSTEM OF JINAN IRON AND STEEL WORK
济钢1750高炉冲渣系统的优化改造
2.
Optinization Improvement on Slag Process for 1750m~3 BF of Jigang
济钢1750m~3高炉冲渣系统的优化改造
3.
blast-furnace cinder
高炉矿渣, 鼓风炉炉渣
4.
cupola slag hole block
冲天炉出渣口成型砖
5.
Study on Separating Titanium from the High Titania Bearing Blast Furnace Slag of Pangang;
攀钢高钛型高炉渣渣钛分离试验研究
6.
portland blast-furnace cement
高炉矿渣硅酸盐水泥
7.
Experimental Study on Slag Optimization of 4000 m~3 BF with Al_2O_3-rich Slag in Masteel
马钢4000m~3高炉高Al_2O_3炉渣渣系优化实验研究
8.
The slag from the furnace is tapped from the slag notch, and it flows through runner into slag ladles or slag yard.
高炉熔渣从渣口放出,顺着流渣沟流进渣罐,或流入渣?
9.
Smelting Practice in No.6 BF of WISCO with High Al_2O_3 in Slag
武钢6号高炉炉渣高Al_2O_3的冶炼实践
10.
Comprehensive analysis of high content of Al_2O_3 BF slag
高炉高Al_2O_3炉渣冶炼综合分析
11.
Research BOF Steel Slag Powder and Blast Furnace Slag Activity of Double-doped
转炉钢渣粉与高炉矿渣粉的双掺粉的活性研究
12.
Study on Treating Blast Furnace Slag by TYNA Granulation Process;
中型高炉图拉法炉渣处理工艺的研究
13.
In 1947 the furnace was lined with clinker some ten metres high.
1947年这座炉子炉膛内堆积了约10米高的炉渣。
14.
Study on Metallurgical Properties of Blast Furnace Burden and Slag Viscosity in Nanjing Iron and Steel Corporation;
南钢高炉炉料冶金性能及炉渣粘度研究
15.
The Research of Utilizing the Hot Energy from Blast Furnace Slag and Steam Circulation Slag Treatment Process
高炉渣热能利用与蒸汽循环法渣处理工艺研究
16.
Study on High Al_2O_3 BF-slag's Metallurgical Property;
高Al_2O_3高炉渣冶金性能的研究
17.
Mechanism of Increasing Concrete Strength by Titanium Contained Blast Furnace Slag
高炉钛渣提高混凝土强度的作用机理
18.
Use of Wastewater from Nitrogen Fertilizer Production for Coal Ash Rinsing from Boiler and Dust Removal from Flue
氮肥生产废水用于锅炉冲灰渣和烟道除尘