1.
Study on Mechanical and Electrical Vibration of Hydraulic Generator Set in Three Gorges;
三峡水轮发电机组机电耦联振荡的研究
2.
Manufacture of Three Gorges hydro power generating unit is a typical example of successful importation of technology
三峡水轮发电机组制造是技术引进成功的范例
3.
Studying of Shaft Torsion of Three Gorges Hydro-generator Unit Caused by a.c.&d.c. Hybrid Transmission System;
交、直流混合输电系统引起三峡水轮发电机组轴系扭振的研究
4.
Domestic Manufacture of Three Gorges Power Station 700 MW Hydro-generating Unit
三峡电站700MW水轮发电机组国产化实践
5.
The Rigidity and Strength Analysis on Hydraulic Turbine Runner of the Three Gorges Power Station(Right Bank)
三峡电站(右岸)水轮机转轮刚强度分析
6.
Adjusting Technique for the General Assembly of Three Gorges Super-huge Turbogenerator
三峡特大型水轮发电机组总装调整技术
7.
Research on Key Technologies of Installed in Three Gorges Right Bank Station Fully Air Cooled Hydro-generators
三峡右岸全空冷水轮发电机关键技术研究
8.
The Researching of Turbine Main Parameters Selection for Three Gorges Right Bank Power Station
三峡右岸水电站水轮机参数选择研究
9.
Study on the Casting Process of the Three Gorges Turbine Blade
三峡电站水轮机叶片的铸造工艺研究
10.
Some Technical Problems of Excitation Rectifier Transform ers of Hy droelectric Generator of Left Shore Power Station in Three Gorges Project
三峡工程左岸电站水轮发电机励磁整流变压器的几个技术问题
11.
Study on the stability and structural characteristics of the Three Gorges hydro-generator units
三峡电站水轮发电机组性能结构特点及运行稳定性研究
12.
Research on Key Manufacturing Technologies of Hydraulic Turbine Runner for Three Gorges Power Plant;
三峡电站水轮机转轮的关键制造技术研究
13.
Study of Manufacturing Technology of Hydaulic Turbine Runner for Three Gorges Project
三峡电站水轮机转轮制造工艺技术研究
14.
New Installation Technology of Bottom Ring for Hydro Turbine Water Distributor
三峡电站Alstom水轮机导水机构底环安装新工艺
15.
Research on Hydro stability and Vibration of TGP 700MW Hydro-turbine;
三峡电站700MW水轮机水力稳定性及水力振动研究
16.
Application of Rotor Earth Fault Protection in Three Gorges Power Station
浅谈转子一点接地保护在三峡700MW水轮发电机组中的应用
17.
Study of Sand-mud Abrasion, Cavitation Damage and Their Protections for the Turbines of the Sanmenxia Hydropower Station
三门峡水电厂水轮机泥沙磨蚀及其防护的研究
18.
Load Rejection Calculation for TGP Right Bank Power Station Hydro-generator
三峡右岸水电站水轮机过渡过程计算分析