说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 转体施工
1.
Research on Construction Control of Sui Fenhe Cable-stayed Bridge with Swivel Erection;
绥芬河转体施工斜拉桥施工控制的研究
2.
Simulation Analysis on Open Thin-wall Box Arch Bridge During Rotation Construction
开口薄壁箱型拱桥转体施工模拟分析
3.
Stability Study on Arch Bridges with Open Thin-walled Boxes under the Turning Construction Stage;
开口薄壁箱拱桥转体施工阶段结构稳定性研究
4.
Research of Turning Construction Monitoring Technique for Open Thin-wall Box-stiffer Arch Bridge;
开口薄壁箱型拱桥转体施工监控技术研究
5.
Finite Element Analysis and Optimization of the Bridge in Rotational Construction;
转体施工桥梁的有限元结构验算及优化
6.
The Research for Local Stability of Arch Web during Swing of Open Cross-Section Thin-Walled Box Arch Bridge
开口薄壁箱型拱桥转体施工中拱肋局部稳定
7.
On Swing Construction of Steel Structure Continuous Box Girder Bridge Crossing Jingguang Railway,Shijiazhuang
石家庄跨京广铁路钢结构连续箱梁桥转体施工
8.
Single-point Flat Hinge Horizontal Rotary Construction Technique for Large-span Cable Stayed Bridge
大跨度斜拉桥单点平铰水平转体施工技术
9.
On the Single-point Turning Construction Technology of the Single Pylon and the Single Plane Cable-stayed Bridge
独塔单索面斜拉桥单点平铰转体施工技术
10.
Reliability analysis on effects of arch bridge construction twist closure error to the entire bridge
转体施工拱桥合龙误差对全桥影响可靠度分析
11.
Twist Construction Technique for Cable-stayed Bridge of Shihuan Highway Crossing Shijiazhuang-Taiyuan Railway
石环公路跨石太铁路斜拉桥转体施工技术
12.
Calculation and Application of Lunching Force in Bridge Construction by Swing
桥梁转体施工过程中顶推力的计算及应用
13.
Stability Study on Arch Bridges with Open Thin-walled Boxes and Cables under the Turning Construction Stage;
带拉索开口薄壁箱拱桥转体施工阶段结构稳定性理论研究
14.
Study on Key Technique of Rotation Construction of CFST Arch Bridge;
钢管混凝土劲性骨架拱桥转体施工关键技术研究
15.
Conversion of Reasonable Construction System for Continuous Beam Turned from Simple Beam
简支转连续梁桥的合理施工体系转换
16.
Study on Construction System of Steel-concrete Composite Arch Bridge by Vertical Rotation
钢-混凝土组合拱桥竖转施工体系研究
17.
Construction Method of Subsection Installing for 120 Ton Converter Installation
一钢轧总厂120 t转炉炉体分段安装施工工艺
18.
Underground Excavation Conversion Technology for Entering Main Construction through Subway Large Adit
地铁特大风道进主体暗挖施工转换技术