1.
Survey and study on characteristic of sediment in the constructing channel of muddy coast
淤泥质海岸航道建设期泥沙回淤特征监测研究
2.
Change of re-siltation in the Yangtze Estuary deepwater channel during 1~(st) and 2~(nd) stages
长江口深水航道(一、二期工程)回淤变化
3.
Study on Exertion of Semi-empirical Formula for Out Channel Resedimentation on Lianyungang Coast;
连云港海域外航道回淤半经验公式运用研究
4.
Study on Morphological Evolution and Siltation in Deep Waterway Due to Channel Re-construction in the North Passage, Yangtze Estuary;
长江口深水航道河床演变与航道回淤研究
5.
Study on Near Bottom Dynamics and Sediment Processes in Turbidity Maximum
基于底边界层研究的航道回淤机制分析
6.
Hydrological sediment condition and sedimentation analysis of Nansha Port, Guangzhou
广州港南沙港区水文泥沙条件及回淤分析
7.
Sediment siltation at Waigaoqiao Phase VI harbor basin of the Yangtze Estuary
长江口外高桥六期码头港池泥沙回淤分析
8.
Calculation results show that the recirculating region and back silting of Plan 2 are smaller than those of Plan 1.
计算结果表明,方案2的回流范围和泥沙回淤强度均小于方案1。
9.
Establishing an Sea-route Safety Forecast Model by Using the ANN in Analysing the Sullage in the Sea-route;
港口航道回淤分析中人工神经网络预测模型的建立
10.
Research on approach channel dimension of Tianjin central fishing port and sediment siltation
天津中心渔港进港航道尺度论证与航道泥沙回淤研究
11.
Bed Load Agradation in Reservoir and Depostion in Variable Backwater Region
水库推移质淤积、变动回水区淤积及回水抬高
12.
Experimental study on sediment deposition in circulation zone of shallow water flows
明渠浅水回流区泥沙淤积的试验研究
13.
Application of Nonparametric Projection Pursuit Regression in Prediction of Dam Land Sedimentation of Warping Dam
非参数投影寻踪回归在淤地坝坝地淤积预测中的应用
14.
Based on the theoretical derivation and the experimental verification, a formula to calculate the sediment deposition rate in the closed Chanel is also derived.
本文还探讨了回流淤积的计算,推导出回流淤积率无量纲函数关系式。
15.
Characteristic of Circumfluence in Dredged Harbor Basins and Its Influence on Siltation;
挖入式港池回流特性及其对淤积的影响研究
16.
The Sediment accumulation Situation of the Variety Back-water Zone In Shanxia Dam;
三峡水库变动回水区泥沙淤积状况及治理
17.
Changes of sediment deposition and erosion at Chongqing reach in backwater area of Three Gorges Project after reservoir adjusting of the upstream in the Yangtze River
水沙调节后三峡工程变动回水区泥沙冲淤变化
18.
Experimental Study of Control Method of Horizontal Circulation and Sedimentation Behind a Spur Dike;
丁坝回流尺度控制方法和减少回流淤积的实验研究