说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 导流隧洞
1.
Construction diversion tunnel(in combination with tailrace tunnel) design of Xiluodu Hydropower Station
溪洛渡水电站导流隧洞(与尾水洞结合段)设计
2.
Construction Technology of Large Cross-Section Diversion Tunnel of Shuibuya Water Conservancy;
水布垭水利枢纽特大断面导流隧洞施工技术
3.
Optimization of Construction Schemes of Diversion Tunnel in Jinping Second Cascade Hydropower Station
锦屏二级水电站导流隧洞施工方案优化
4.
Progress of design theory and safe operation technology for diversion tunnels
施工导流隧洞设计理论与安全运行技术进展
5.
Analysis of external water pressure and construction cold joint influence on diversion tunnel
导流隧洞外水压力与施工冷缝的影响分析
6.
Finite element analysis of combined support system of steel arch shelf and lock bolting with shotcrete in diversion tunnel
导流隧洞钢拱架与喷锚支护体系有限元分析
7.
Analysis on surrounding rock stability and supporting structure for diversion tunnel of Gongguoqiao Hydropower Station
功果桥导流隧洞围岩稳定与支护结构分析
8.
Application of New Austrian Tunneling Method to construction of diversion tunnel for Dalong Water Control Project
新奥法在大隆水利枢纽工程导流隧洞施工中的应用
9.
Comprehensive Construction Technique Study and Analysis in the Condition of Complicated Geology of Diversion Tunnel with Extra-large Section;
复杂地质条件下特大断面导流隧洞综合施工技术研究与分析
10.
FEM CALCULATION OF HIGH INLET SLOPE OF DIVERSION TUNNEL ON RIGHT BANK OF CHANGHEBA HYDROPOWER STATION
长河坝水电站右岸导流隧洞进口高边坡稳定性有限元计算分析
11.
Study on Variable Fuzzy Evaluation for Stabilizing of Surrounding Rock in Diversion Tunnel
基于多目标可变模糊评价法的导流隧洞围岩稳定性分级研究
12.
The application of the New Austrian Tunneling Method to the tunneling of the diversion tunnel for Dalong Water Control Project is described herein.
主要介绍新奥法施工在三亚大隆水利枢纽工程导流隧洞开挖中的应用。
13.
The Stability Analysis of Soft Surrounding Rocks of Big-span Diversion Tunnel and the Research on the Support Measure in Goupitan Hydroelectric Station;
构皮滩水电站大跨度导流隧洞软岩段围岩稳定性分析及支护措施研究
14.
Monitoring and Measurement Technology of the Emergence of Shallow Buried Unsysmmetrical Loaded Small Guide Hole
浅埋偏压隧道小导洞出洞施工与监控量测技术
15.
Numerical Simulation of Turbulent Flow of Energy Dissipater in Free Flow Tunnel;
无压隧洞内消能工湍流数值模拟研究
16.
Monte Carlo Solution of Two-Dimensional Potential Flow in Outlet Structure of Pressure Tunnel;
有压隧洞出口段水流的二维势流蒙特卡罗解
17.
In some cases, work on the main tunnel progresses a few meters behind the pilot tunnel so that the latter provides ventilation, always a major problem in tunneling operations.
有时,主隧道的掘进紧跟在导洞掘进后面几米,由导洞提供通风。通风一直是隧道掘进中的大问题。
18.
A guide led us through the maze of tunnels in the cave.
向导带领我们通过山洞里如迷宫般的隧道。