1.
Quality Evaluation for Contractor Service of Equipment Based on Fuzzy Comprehension Assessment
基于模糊综合评判的装备合同商服务质量评估
2.
Study on the System of Dealing with Breach of Equipment Contract in America and Its Inspiration;
美军装备合同违约处理制度研究及启示
3.
Each piece of Contract Equipment shall be shipped in complete set whenever possible.
合同设备的装船应尽可能地单机成套
4.
The Theoretical Research on Linear Incentive Contract of Equipment Procurement;
装备采购中线性激励合同的理论研究
5.
Management System of Equipment Procurement Contract Based on UML
基于UML的装备采购合同管理系统
6.
Contract 245 shipment ready advise when l/c establish
245号合同已准备装船,请通知何时开信用证。
7.
Cot 378 shpt ready adv. when l.c. establish
378号合同货物已准备装船,请告何时开信用证。
8.
A Research on the Equipment Development Contract Management under the Project Management Mode;
项目管理在装备研制合同管理中的应用研究
9.
Problems and Solutions to the Management of Equipment Procurement Contracts in the PLA;
我军装备采购合同管理存在问题及对策
10.
Analysis and reference on the equipment procurement contract management of the United State Army;
对美军装备采购合同管理的分析与借鉴
11.
On the Law-result of the Equipment-purchasing Contract Against Legal Form;
论装备采购合同违反法定形式的法律效果
12.
"Erection means the installation of the equipment, spare parts and materials including placing and connecting the parts to their positions according to the design drawing, details of which are specified in Appendix 10."
安装:本合同附件十规定的合同项目全部设备的装配、就位和连接等组装工作。
13.
Sufficient shores or chocks shall be provided in order to prevent the Contract Equipment from moving inside the containers.
集装箱内要有足够的填充物或楔子以防合同设备在集装箱内摇晃。
14.
"Test Runs means the test conducted respectively on the individual equipment and a series of equipment after Erection in order to check the mechanical performance of Contract Equipment, details of which are specified in Appendix"
试车安装之后设备的单独或联动的试运转以检测合同设备的机械性能。详见合同附件十。
15.
tract of on-carriage
(集装箱) 续运合同
16.
"In case of container transportation, the Seller shall examine the conditions of the containers so that only those in good conditions shall be used for delivery of the Contract Equipment."
如果是集装箱运输,卖方要仔细检查集装箱以使处于良好状态的集装箱来运输该合同设备。
17.
Carry out erection of the equipment at Buyer's own cost as per Chapter 6 of this contract
依照本合同第六章的规定,自担费用自行完成设备的安装;
18.
Our client plans to cancel the contract because you have not been able to ship the goods in time .
我方客户准备取消此合同,因为你方未能及时装运这批货物。