1.
Summary of Construction Technology for Structure of Steel-concrete Column on Upper Part of Powerhouse of Dahuashui Hydropower Station
大花水水电站厂房上部钢—混凝土柱结构施工技术综述
2.
Model Test on Drop Slit-Bucket of the Middle Outlet Works in Arch Dam for Dahuashui Hydropower Station;
大花水水电站拱坝中孔跌坎窄缝消能工试验研究
3.
producibility of hydro electric power station
水力发电站最大发电量
4.
Application of Chemical Grouting in Treatment for Concrete Dam Cracks of Dahua Hydropower Station
化学灌浆技术在大花水电站大坝混凝土裂缝处理中的应用
5.
Peculiarity of rockfill dam with clay core design at Lianhua hydropower station
莲花水电站粘土心墙堆石坝设计特点
6.
Rockfill dam with face slab construction of Lianhua water power station
莲花水电站面板堆石坝坝体填筑施工
7.
floating power barge
水上动力站水上发电站
8.
Specification of reservoir operation for large and medium-scale hydropower stations
GB17621-1998大中型水电站水库调度规范
9.
Construction Technique for Large Diameter Discharging Tunnel in the Luoxidu Hydropower Plant
溪洛渡水电站大孔径排水孔施工技术
10.
Tai Shui Hang Lowland Raw Water Pumping Station
大水坑低地原水抽水站
11.
HOW TO EVALUATE THE BENEFIT OF HYDROPOWER PROJECTS WITH HIGH DAMS AND LARGE RESERVOIRS IN CHINA
水电开发中如何评价高坝大库水电站的效益
12.
Effect of rodents killing in two large reservoirs region
大型水电站库区大面积灭鼠效果研究
13.
hydroelectric(power) statio
水(力发)电厂[站]
14.
Quality Control of Foundation Excavating Construction of Arch Dam in Huanghuazai Hydropower Station
黄花寨水电站拱坝坝基开挖施工质量控制
15.
Study on Optimum Load Distribution between Units of Mianhuatan Hydropower Station
棉花滩水电站机组间负荷最优分配研究
16.
dam - diversion type hydroelectric power station
坝-引水混合式水电站
17.
Hydroelectric power stations are to be built in large numbers where water resources are plentiful.
只要那里水源充分,就在那里修建大批的水电站。
18.
Where water resources are plentiful, hydro-electric power stations are being built in large numbers.
只要哪里水源充足,就在哪里修建大批的水电站。