说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 乐滩水电站
1.
Technical Innovation for Mechanical Hydraulic Drive System of Letan Governor
乐滩水电站调速器机械液压系统改造
2.
Waterway Flushing Test on Overall Hydraulic Model for Letan Hydropower Station
乐滩水电站整体水工模型航道冲沙试验研究
3.
Practice proved that the option on electromechanical equipment for Letan hydropower station was rational.
实践证明,乐滩水电站机电设备的选型是合理的。
4.
Intelligent control of Letan PZWST governor
乐滩水电站PZWST型微机调速器的智能控制
5.
Study on Flow Pattern in Ship Lock Chamber of Letan Hydropower Station and Countermeasures
乐滩水电站船闸闸室流态问题的研究与对策
6.
Ertan hydropower station is the first power station built on Yalong River.
二滩水电站是雅砻江梯级开发的第一个水电站。
7.
Estimation of Adit Dirt Volume in Longtan Hydropower Station Dam Area
龙滩水电站坝址区平洞结垢量的估算
8.
SEISMIC HAZARD ANALYSIS OF THE ERTAN DAM SITE
二滩水电站坝区场地地震危险性分析
9.
Appraisal on Supervision Work of Arch Dam Works of Ertan Hydropower Project;
二滩水电站拱坝工程监理工作后评估
10.
Financing for the Longtan Hydropower Project and its funds management;
龙滩水电站工程融资和资金使用管理
11.
Design on Dam Crest Gantry Crane and Access Bridge of Gelantan Hydropower Station
戈兰滩水电站坝顶门机及交通桥设计
12.
Optimization of Protection Configuration for 10kV Station Transformers of Longtan Hydropower Station
龙滩水电站10kV厂用变保护的优化配置
13.
Joints Grouting Construction Technology of Arch Dam in Goupitan Hydropower Station
构皮滩水电站拱坝接缝灌浆施工技术
14.
Overview on Bulb Tubular Turbine Generator Design for Jinjitan Hydropower Station
金鸡滩水电站灯泡贯流式水轮发电机设计综述
15.
Summarization on the design of 6.3/0.4kV drainage transformer substation on plunge-pool at Ertan Hydropower Station
二滩水电站水垫塘6.3/0.4kV排水工程设计综述
16.
Chemical Grouting Treatment to Leakage in Transverse Joints inside Dam Body of Lingjintan Hydropower Station
凌津滩水电站坝体横缝漏水化学灌浆处理
17.
The Water Turbine Stability Problem Study for Wujiang Goupitan Hydropower Station;
乌江构皮滩水电站水轮机稳定性问题研究
18.
Discussion on Favoring the People of Relocation by Aquatic Breeding in Luodian Reservoir of Longtan Hydropower Station;
龙滩水电站罗甸库区水产养殖反哺移民的探讨